An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009

  2. Outline CCW Plant Expansion (WBS 1.05.03.04) Construction Package Scope Construction Package Schedule Construction Package Management/Oversight CCW Piping (WBS 1.05.03.05) Construction Package Scope Construction Package Schedule Construction package Management/Oversignt

  3. CCW Plant Expansion • Scope (WBS 1.05.03.04) • Five (5) bay expansion to the existing CCWF (B-0600), • Central Chilled Water (CCW) Plant expansion shared between NSLS-II and BNL • NSLS-II share is 3 bays & two chillers+- • Expansion of the CCW Pump House (B-0600A) by five (5) pump bays • Installation of two (2) 1,250-ton electric centrifugal chillers & associated pumps • Addition of two (2) cooling tower cells (cooling tower basin construction for 5 cells) • Addition to existing electrical substation • Associated electrical, mechanical, HVAC infrastructure and site work.

  4. CCW Plant Expansion • Construction Package ScheduleBaselineCWE • Bid Package available (design pkg) 12/10/08 11/19/08(A) • Bid Solicitation (IFB in DOE review) 1/29/09 3/13/09 • Bids Returned 3/3/09 4/26/09 • Contract Award 4/28/09 5/29/09 • Notice to Proceed (Construction Start) 6/4/09 7/06/09 • Construction Complete (Beneficial Occupancy) 3/24/11 1/31/11 • Operations (CCWF added capacity available) 3/24/11 2/28/11 • Procurement process is lagging by ~1+ month but have ~3 months float before CCW is needed

  5. CCW Plant Expansion • Construction Package Management/Oversight • Design • Design by Giffels Partnership (consultant A/E) • Design management by BNL Energy Management Division (EMD) • Design review by NSLS-II • Procurement • Bid solicitation by BNL Procurement & Property Management Division (PPM) with BNL Modernization Program Office (MPO) (*) • Review by NSLS-II (*) • Construction • Construction management/oversight by BNL MPO (*) • Review by NSLS-II (*) • * - These activities performed in accordance with a CCW Expansion Project Management Plan to be issued by NSLS-II

  6. CCW Plant Expansion North

  7. CCW Plant Expansion North 3 Additional Bays & 2 Chillers for NSLS-II New Existing 2 Additional Bays for BNL B-600 Operating Floor Plan

  8. CCW Piping Scope (WBS 1.05.03.04) New 24” diameter CCW Supply, 24” diameter CCW Return & 3” diameter Compressed Air piping New piping extends between the existing CCW/CA mains on Rochester Street to a point at the edge of the NSLS-II Ring Building Construction site Total distance of approximately 1,100 feet Includes all excavation/backfill, valves, appurtenances and connections to existing CCW and CA mains and site restoration.

  9. CCW Piping Construction Package ScheduleBaselineCWE Bid Package Ready 2/26/09 3/23/09 Bid Solicitation 4/20/09 4/17/09 Bids Returned 5/4/09 5/08/09 Contract Award 6/1/09 5/22/09 Notice to Proceed (Construction Start) 6/29/09 6/19/09 Construction Complete 12/31/09 12/18/09

  10. CCW Piping Construction Package Management/Oversight Design Design by Giffels Partnership (consultant A/E) Design management by BNL Energy Management Division (EMD) Design review by NSLS-II Procurement Bid solicitation by BNL/ NSLS-II PPM Construction Construction management/oversight by NSLS-II

  11. CCW Piping North B-0452 Upton Gas Station Existing CCW/CA Mains (Rochester Street) CCW Piping Plan – Part 1

  12. CCW Piping Existing Drainage Swale & Culverts North Interface with Ring Building Piping Intersection Rowland St. & Groves Street CCW Piping Plan – Part 2