PROJECT INFORMATION SESSION Small Business Enterprise

PROJECT INFORMATION SESSION Small Business Enterprise SR 44 from Lake/Sumter County Line to SR 44/CR 468 Project 427230-1 December 13, 2010. Derek Dixon Consultant Project Management. PROJECT LOCATION. Begin Project. End Project. PROJECT LIMITS.

Download Presentation

PROJECT INFORMATION SESSION Small Business Enterprise

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT INFORMATION SESSION Small Business Enterprise SR 44 from Lake/Sumter County Line to SR 44/CR 468 Project 427230-1 December 13, 2010 Derek Dixon Consultant Project Management

  2. PROJECT LOCATION Begin Project End Project

  3. PROJECT LIMITS LIMITS: SR 44 - Begin MP 0.000 (Lake/Sumter County Line). CR 468 - End MP 2.468 MITS (Pavement Change East of CR 468/SR44).

  4. SPECIFIC PROJECT DETAILS • The Pavement Design Will be Done by The Department • Restripe the Urban Section to Accommodate a 4.0’ • Bicycle Lane

  5. PROJECT INFORMATION • Old Construction Projects Numbers – 238040-1 and 238241-1 • Level of Community Awareness plan : 1 • Stormwater Management District : SJRWMD • Number if Existing Utilities : Eight – • AT&T - Distribution & Transmission • Bright House Networks, LLC • City of Leesburg – Electric, Gas and Water • Comcast Cable • Progress Energy • Century Link • Posted and Design Speed :SR 44 – Posted 55 MPH (MP 0.000 to MP 2.220) • Posted 45 MPH (MP 2.220 to MP 2.365) • Design Speed (From plans for 238241-1) • SR 44 – Design 65 MPH (MP 0.000 to MP 1.600) • Design 45 MPH (MP 1.600 to MP 2.365)

  6. IMPORTANT DATES • Advertisement – January 11th, 2011 • Letters of Interest – Response Deadline January 21st, 2011 • Short-list – February 7th, 2011 • Final Selection – March 31st, 2011 • PE Begin – May 2011 Note: These dates are preliminary and subject to change.

  7. CD CONTENTS • Technical Scope • Straight Line Diagram • Right-of-Way Maps • Construction Plans • Project Information Session Presentation

  8. PROJECT SCOPE • Mill and Repave • Existing Asphalt and Paved Shoulders • Eastbound and Westbound Lanes • 2 Roadway Typical Sections • Reconstruct 17 ramps and a pedestrian island at • SR 44/CR 468 intersection • Install Approximately 3 Detectable • Warning Devices on Existing Curb Ramps • Minor Sidewalk Additions

  9. QUESTIONS?