Issaquah Hobart Road Corridor Study

Issaquah Hobart Road Corridor Study. GMVUAC Presentation June 1, 2009 David Mark and Jim Ishimaru Road Services Division King County Department of Transportation. Study Area Boundary. Study Purpose:. Analyze existing and future traffic conditions along the Issaquah-Hobart Road Corridor

brinly
Download Presentation

Issaquah Hobart Road Corridor Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Issaquah Hobart Road Corridor Study GMVUAC Presentation June 1, 2009 David Mark and Jim Ishimaru Road Services Division King County Department of Transportation

  2. Study Area Boundary

  3. Study Purpose: • Analyze existing and future traffic conditions along the Issaquah-Hobart Road Corridor • Develop short & long term Transportation project recommendations, consistent with Comprehensive Plan policy direction • Use a new subarea traffic model to test different “what if” scenarios • Establish an Interagency Technical Advisory committee to help finalize recommendations

  4. Current Conditions and Issues • Issaquah-Hobart Road functions as an Urban Connector with unique rural characteristics • Frequent accidents along entire length of Issaquah-Hobart Road • Safety/parking issues near hang-glider area • Slow-moving commute traffic • Intersection delay at SE May Valley Road & Cedar Grove Road intersections • Fifteen mile creek bridge needs replacement

  5. Issaquah- Hobart Road: Accident data, 2004-2007

  6. Future traffic issues / deficiencies

  7. Project Recommendations - Short term • Install No Parking signs near Hang Glider Park • Install traffic cameras at Cedar Grove Road and May Valley Road intersections to monitor traffic conditions • Install digital message sign near SE Mirrormont Blvd • Interconnect signals at Cedar Grove Road and May Valley Road to allow intersections to be controlled at traffic center • Review for possible new warning signs at high accident locations

  8. Initial Project Recommendations – Long term • Complete SR-18 widening from Issaquah-Hobart Road to I-90 • Replace Fifteen mile creek Bridge • Expand existing Hang glider parking lot • Construct roundabouts at intersections with May Valley Road & Cedar Grove Road • Improve channelization from May Valley Road to Issaquah City Limits • Install fiber optics, flood sensors and weather station in the corridor

  9. Next steps • Work to include project recommendations in our Six Year Capital Improvement Program • Work with local jurisdictions and UACs to address other SE King County traffic needs

  10. Comments? Suggestions? • Contact: • David Mark, Supervisor, Technical Data Group • Phone: (206) 263-6273 • Email: david.mark@kingcounty.gov