ONEONTA SOUTHSIDE CORRIDOR STUDY

MEETING #3 - July 23, 2002. ONEONTA SOUTHSIDE CORRIDOR STUDY. NYSDOT Region 9 The SEAR-BROWN Group Howard/Stein-Hudson Eng-Wong, Taub & Associates. Agenda. IV. Draft Recommendations A. Short-Term B. Long-Term V. Next Steps VI. Questions/Comments. I. Introductions/Agenda

wallis
Download Presentation

ONEONTA SOUTHSIDE CORRIDOR STUDY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEETING #3 - July 23, 2002 ONEONTA SOUTHSIDECORRIDOR STUDY NYSDOT Region 9 The SEAR-BROWN Group Howard/Stein-Hudson Eng-Wong, Taub & Associates

  2. Agenda IV. Draft Recommendations A. Short-Term B. Long-Term V. Next Steps VI. Questions/Comments I. Introductions/Agenda II. Alternative Development A. Methods B. List of Potential Alternatives C. Alternatives and Needs III. Alternative Evaluation A. Evaluation Process B. Phase I Evaluation C. Phase II Evaluation D. Evaluation Matrix

  3. Study Progress to Date • SAG Formation • Goals and Objectives • Input on What the Problems Are • Data Collection • Existing Conditions • Existing Needs and Deficiencies • Alternative Development and Evaluation

  4. Alternative Development • Methods • NYSDOT Ideas • Sear-Brown Ideas • SAC Ideas • Public Ideas

  5. List of Potential Alternatives • Exit 13/Route 7/Route 205 Area • Proper Lane Alignment (various sub-alternatives) • Signalize I-88 Ramp Intersections • Exit 14/Main Street Area • Signalize I-88 Eastbound Ramps Intersection • Modify Bridge Abutments to Improve Sight Distance • Full-Access Interchange • Reduce Main Street to a 3-lane Cross Section

  6. List of Potential Alternatives • Exit 15/Lettis Highway Area • Improve Pavement Friction • Reduce Speed Limit • “Signal Ahead” Signs • Auxiliary Signal Heads • Increase All-Red Clearance • Sidewalks Along Lettis Highway

  7. List of Potential Alternatives • Lettis/Route 23/Route 28 Intersection • Lengthen Inside Southbound Left Turn Lane • Install Median Barrier from Lettis to Mall Driveway • Side-by-Side Left Turn Lanes • Extend 2nd Eastbound Thru Lane • Overhead Lane Designation Signs

  8. List of Potential Alternatives • 23/28 Southside Corridor • Five-Lane Cross Section, to Christopher’s or Main St. • Bicycle Accommodations • Sidewalks • Pedestrian Buttons/Signals • Area-Wide/Multiple Locations • Ped/Bike Connections to Susquehanna Greenway Trail • Expanded Transit Routes • Extended Evening Transit Routes • North-South Connector Road, Rte. 47 to Rte. 23

  9. Alternatives and Needs

  10. Alternative Evaluation • Evaluation Process • Phase 1 - Preliminary Screening • Phase 2 - Planning Level Evaluation

  11. Phase 1 Assessment • Alternatives Eliminated in Phase I • Alt. 5 - Modify Exit 14 to provide full-access • Alt. 24 - New Connector Road between CO Route 47 (I-88 Exit 16) and Route 23

  12. Phase II Assessment • Evaluation Matrix • Evaluation Factors • Construction Cost • Social/Environmental • Engineering Effects • Traffic/Safety Assessment

  13. Phase II Assessment

  14. Phase II Assessment

  15. Draft Recommendations • Sear-Brown and NYSDOT Input • Short-Term • Long-Term • Comparison to Identified Needs • Still Requires Public Input

  16. Short-Term Recommendations • Exit 13/Route 7/Route 205 • Re-striping for Better Lane Alignment • Signalized I-88 Ramp Intersections • Exit 14/Main Street • Signalized I-88 Eastbound Ramp

  17. Short-Term Recommendations • Exit 15/Lettis Highway • Improve Pavement Friction • “Signal Ahead” Signs • Auxiliary Signal Heads • NYSDOT Signal Re-Timing • Route 23/28 Corridor • Pedestrian Buttons/Signals

  18. Short-Term Recommendations • Lettis/Route 23/Route 28 • Lengthen Inside Southbound Left Turn Lane • Median Barrier, Route 23 to Mall Driveway • Extend Outside Eastbound Thru Lane • Overhead Lane Designation Signs • Areawide/Multiple Locations • Expanded Transit Routes • Expanded Transit Hours

  19. Long-Term Recommendations • Exit 13/Route 7/Route 205 • 5-Lane Section • Exit 14/Main Street • Main Street 3-Lane Section

  20. Long-Term Recommendations • Exit 15/Lettis Highway • Narrow Cross Section • Install Sidewalks • Route 23/28 Corridor • 5-Lane Section, Main Street to Past Wal-Mart • 14 Foot Outside Lane for Bikes • Sidewalks on One Side

  21. Long-Term Recommendations • Lettis/Route 23/Route 28 • Nothing • Areawide/Multiple Locations • Pedestrian/Bike Connections to Susquehanna Trail

  22. Next Steps • Public Input • SAC • Public Meeting • Transportation Action Plan • Final Report • Project Programming/Detailed Study

  23. Schedule • SAG Meetings • Do We Need One More? • Public Meeting • September

  24. Questions/Comments/Concerns?