1 / 10

Background BDP Needs Capacity Building/ Training

Background BDP Needs Capacity Building/ Training. 3 Parallel Processes in BDP. PL. CB. PP. Planning Process Capacity Building Dialogue/Participation. 5 Stages - Training ( short & long ) - Study tour, Workshop . - Meeting, working session Forum The public

brone
Download Presentation

Background BDP Needs Capacity Building/ Training

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Background BDP Needs Capacity Building/ Training

  2. 3 Parallel Processes in BDP PL CB PP • Planning Process • Capacity Building • Dialogue/Participation • 5 Stages • -Training ( short & long ) • -Study tour, Workshop. • -Meeting, working session • Forum • The public • Other Stakeholders • Decision-makers

  3. About BDP TNAs to date • During Bridging period 2000 – general • 2. BDP structure TNAs (WGS) for BDP immediate needs (LNMC & CNMC 02, VNMC –TNMC 04 ) • 3. ITP June 2003 • 4. TNA in Thailand Aug. 04

  4. Findings TNA 2000 • BDP is complex • Cross Sectoral planning • Spatial ( large- space/area) planning • Cross admin boundary planning • Requires Modern approach to IWRM & INRM- need applied knowledge incross cutting themes- than just traditional sectors

  5. TNA 2000- some suggestions • River Basin Planning • IWRM/ Planning • Natural Resources planning/management • Integrated Watershed planning and management • Socio-economic and political/administrative aspects of integrated water resources management • Linking natural resources and environmental economics • Strategic planning process, guidelines and criteria • Hydrology related processes linked to transboundary impact analysis • Social-economic impact assessment of projects

  6. BDP-TNA. Dec 02 & June 04 Finding & recommendations • 7core competencies (important for all members of BDP Unit/working groups) • 3 areas of technical competencies

  7. Basic Competencies 1. Communication 2. Facilitating Skills 3. Management & Training Capability 4. Project Design and Planning 5. Public Participation 6. Action Research 7. Integrated River Basin Planning BDP Core Competencies

  8. IRBP: Way forwards in BDP • Field test curriculum • Training of Trainers ( IRBP) • National package • Replication of this course • Synthesis & evaluation workshop • Dissemination of TM to training institution in 10 SAs

  9. IRBP: Way forwards in BDP • Field test ( JRP) May • TOT (SAWG/Uni+ Institutions in SA) June • National package /translation -> Phase 2 • Replication of this course- Phase 2 • Synthesis/ evaluation workshop- Phase 2 • Disseminate TM to training institutions in 10 SAs -> Phase 2 BUDGET: US $ 131,000

  10. IRBP: Way forwards in MRC • Package for executives • Orientating MRC new staff • Selected target groups from ITP – for kick start • ** Budget, trainers, action programneeded ???

More Related