An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Item #2b Zone 4 Line A Sources Pathways and Loadings Workgroup May 14, 2008 Rand Eads RiverMetrics LLC www.rivermetrics.com rivermetrics@gmail.com 503-435-7516

  2. Item #2b HY 2008 SummaryPreliminary Data • Moved station to downstream end of culvert due to delayed completion of construction upstream • Data collection began on 1/31/08 • Low precipitation: 2.15 inches (3 months) • 13 storm events • Max turbidity/SSC: 892 TU/358 mg/L • Max stage 2.91 ft. (3.41 ft 1/4/08 manual) • 15 SSC pumped samples processed to date, 33 unprocessed, budgeted for 100

  3. Item #2b Shelter, Data Logger, Pumping Sampler, Rain Gage, Solar Panel, Cellular Telemetry Bed-Mounted Sampling Boom Staff Plate

  4. Item #2b

  5. Item #2b

  6. Item #2b

  7. Item #2b

  8. Item #2b

  9. Item #2b

  10. Item #2b

  11. Item #2b

  12. Item #2b