Opened: 2012 Gross Square Feet: 70,509 Construction Bid: $21,359,000

Wilkes Elementary School Bainbridge Island School District. Opened: 2012 Gross Square Feet: 70,509 Construction Bid: $21,359,000 Construction Final Cost: $21,714,411 Cost per Square Foot: $308 Architect: Mahlum General Contractor: Spee West Construction.

bryson
Download Presentation

Opened: 2012 Gross Square Feet: 70,509 Construction Bid: $21,359,000

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wilkes Elementary School Bainbridge Island School District Opened: 2012 Gross Square Feet: 70,509 Construction Bid: $21,359,000 Construction Final Cost: $21,714,411 Cost per Square Foot: $308 Architect: Mahlum General Contractor: Spee West Construction Wilkes Elementary School – Comparable Schools from Neighboring School Districts

  2. Cherry Crest Elementary School Bellevue School District Opened: 2012 Gross Square Feet: 76,950 Construction Bid: $22,349,000 Construction Final Cost: $22,838,769 Cost per Square Foot: $297 Architect: NAC Architecture General Contractor: Bayley Construction Wilkes Elementary School – Comparable Schools from Neighboring School Districts

  3. Machias Elementary School Snohomish School District Opened: 2011 Gross Square Feet: 70,370 Construction Bid: $20,045,867 Construction Final Cost: $21,355,894 Cost per Square Foot: $303 Architect: NAC Architecture General Contractor: Graham Construction Wilkes Elementary School – Comparable Schools from Neighboring School Districts

  4. Carl Sandburg Elementary School Lake Washington School District Opened: 2012 Gross Square Feet: 66,580 Construction Bid: $20,674,700 Construction Final Cost: $21,720,911 Cost per Square Foot: $326 Architect: NAC Architecture General Contractor: Spee West Construction Wilkes Elementary School – Comparable Schools from Neighboring School Districts

  5. Rachel Carson Elementary School Lake Washington School District Opened: 2008 Square Feet: 56,506 Construction Bid: $16,100,000 Construction Cost: $17,500,000 Cost per Square Foot: $310 Architect: Integrus Architecture General Contractor: Kassel Construction Wilkes Elementary School – Comparable Schools from Neighboring School Districts

  6. St. Thomas School Medina, Washington Opened: 2008 Square Feet: 55,000 Construction Bid: Not available Construction Final Cost: $19,500,000 Cost per Square Foot: $355 Architect: Bassetti Architects General Contractor: Sellen Construction Wilkes Elementary School – Comparable Schools from Neighboring School Districts

  7. Benjamin Rush Elementary School Lake Washington School District Opened: 2013 Square Feet: 67,250 Construction Bid: $23,765,374 Construction Cost: $24,873,086 Cost per Square Foot: $370 Architect: Integrus Architecture General Contractor: Mortenson Construction Wilkes Elementary School – Comparable Schools from Neighboring School Districts

  8. Wilkes Elementary School ENERGY CONSUMPTION COMPARISON Old School New School 2010 2013 Comparative Period Nov. 6-Dec. 7 Nov. 6-Dec. 7 PSE KWH 41,852 72,600 Propane KWH 71,315 0 Total Monthly KWH 113,167 72, 600 Invoice Amount PSE $4,700 $9,320 Invoice Amount Propane $4,348 0 Total Invoice Amounts $9,047 $9,320 Heated Square Footage 44,958 63,462 Cost per Square Foot $ 0.201 $0.147 Today’s Relative Cost $14,528 $9,320 = Percent Savings 36% Wilkes Elementary School – Energy Consumption Comparison