1 / 13

Dan Gabriel Ghiţă IFIN-HH

New Tandem Accelerators for Applied Research in IFIN-HH Status of the Installation of 3 MV Tandetron. Dan Gabriel Ghiţă IFIN-HH. Investment project.

buck
Download Presentation

Dan Gabriel Ghiţă IFIN-HH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NewTandemAcceleratorsforAppliedResearchinIFIN-HHStatusoftheInstallation of 3 MV Tandetron Dan Gabriel Ghiţă IFIN-HH

  2. Investment project • The infrastructure investment was done in the framework of the project 7PM/1/2008 / 29.10.2008 granted by National Authority for Scientific Research [1] • Director of the project: Dr. Nicolae Victor Zamfir (General Director of IFIN-HH)

  3. The 3 MV Tandetron Accelerator Dedicated to IBA • Installation began in the middle of 2012 • Manufactured by High Voltage Engineering Europa B.V. - The Netherlands • Beamline dedicated to IBA • Beamline dedicated to implantation

  4. The 3 MV Tandetron Accelerator Dedicated to IBA Duoplasmatron ion source Model 358 with sodium charge exchange Negative sputter ion source Model 860A

  5. The 3 MV Tandetron Accelerator Dedicated to IBA “T” Shape – medium current plus – Tandetron acceleratorwith a maximum voltage on the terminal of 3 MVTitanium spiraled field accelerator tubesGas stripper with stripper canal,stripper gas re-circulating pump and motor-generator setCarbon foil stripping systemMedium-current Cockroft-Walton type HV power supply 

  6. The 3 MV Tandetron Accelerator Dedicated to IBA Ion beam analysis chamber Ion implantation chamber

  7. Beamline and End-Station for Ion Implantation • Electrostatic X-Y beam sweep system • Beam monitoring system with • Un-cooled carousel • Heatabletarget holder • Coolabletarget holder

  8. Beamline and end-station for Ion Beam Analysis Electrostatic quadrupole lens for µ-beam applicationsBeam profile monitor (BPM)Multi-sample holder 4-axis sample manipulator with     . sample holder for multiple samples,    . three stepping motor controlled rotations    . one stepping motor controlled Y-translationFixed detector holder with ion implanted charged particle detectorCCD cameraLN2 trapManual movable RBS detectorMultiple sample holder for ERDA measurements that Retractable HPGe Gamma-ray detector Retractable HPGe X-Ray detector placed inside the reaction chamber and having thin Be window

  9. Preliminary results from the acceptance tests A typical uncalibratedqualitative PIXE spectrum obtained at the interaction of 3 MeV proton beam with a thin solid target. The spectrometer resolution is 160 eV at 5.9 keV. May be clearly seen the X-Ray transitions of the target constituent elements: MnKand K, Ni Kand Cu Kand K. From the peak intensity can be determined with great precision the concentrations of elements. RO-ICAC 2012

  10. Preliminary results from the acceptance tests RBS raw spectra measured in collision of 3 MeV 4He+ beam with a thin layer of Au on a Si substrate. As can be seen, the measured energy of a backscattered particle easily allows to determine the mass of the target atom. Also the projectiles scattered below the surface lose energy and consequently energy scale yields the depth profile of constituent elements of probe. RO-ICAC 2012

  11. CONCLUSIONS • The installation of the 3MV Tandetron acceleratorcreates great opportunities for research using IBA techniques in various domains like medicine, archeology, geology, material science, pharmacology, environmental sciences, forensic investigations, nuclear physics and in many other domains. IWTA 2012

  12. Acknowledgments • Tandem engineers: Daniel Vasile Moşu, Iani Mitu, Gabriel Dumitru, Bogdan Savu, Iani Mitu, Cătălin Călinescu • Tandem technical team: DorinMoisa, Constantin Crăciun, Gheorghe Mihon, Gheorghe Ion, Cristian Florea, Cristian Păun, Ionuț Brînzan, Gigi Naghel, Mihai Badea, Stancu Cojocaru, Viorel Bătrâneanu, Cristian Popescu and Laurențiu Povariu IWTA 2012

  13. THANK YOU! 1 MV Tandem website: http://tandem.nipne.ro/~tnd3m/index.html IWTA 2012

More Related