RHIC PS UPDATE 1/21/14. NESTED IR PS HI-POTS COMPLETE NESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXES UNLOCKING NESTED IR PS’S THIS WEEK 77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS 10K MAIN RING HI-POT 7.5K LOW CURRENT PS TESTING BEGINS 4.5K 24 HR SOAK MAIN PS TURNS ON.
E N D
RHIC PS UPDATE 1/21/14 NESTED IR PS HI-POTS COMPLETE NESTED IR PS CABLES CONNECTED AT LINK BOXES AND VALVE BOXES UNLOCKING NESTED IR PS’S THIS WEEK 77K HI-POTS OF SEXTUPOLE AND TQ MAGNETS 10K MAIN RING HI-POT 7.5K LOW CURRENT PS TESTING BEGINS 4.5K 24 HR SOAK MAIN PS TURNS ON