400 likes | 422 Views
district development Tanzania – Lake Victoria Greenstone Belt. district development Tanzania – Lake Victoria Greenstone Belt. Barrick Properties. Bulyanhulu. Barrick Properties. district development Tanzania – Lake Victoria Greenstone Belt. Pangea properties. Barrick properties.
E N D
district developmentTanzania – Lake Victoria Greenstone Belt
district developmentTanzania – Lake Victoria Greenstone Belt Barrick Properties Bulyanhulu Barrick Properties
district developmentTanzania – Lake Victoria Greenstone Belt Pangea properties Barrick properties Bulyanhulu Pangea properties Pangea properties Barrick properties
GEITA BULYANHULU 10.5 Moz reserve Barrick Gold Corporation GOLDEN PRIDE regional geologyTanzania – Lake Victoria Greenstone Belt
Musoma Geita Bulyanhulu Tulawaka Golden Pride Sekenke district developmentTanzania – Lake Victoria Greenstone Belt
Bulyanhulu district development • 21 licenses • 2,000 sq.km. Bulyanhulu Golden Ridge
Sekenke district development • 26 licenses • 2,400 sq.km. Sekenke
Geita district development • 18 licenses • 1,200 sq.km. Geita Mine Bulyanhulu
Tulawaka district development • 14 licences • 1,000 sq.km. Tulawaka Bulyanhulu
district developmentTanzania – Lake Victoria Greenstone Belt Musoma Geita Bulyanhulu Tulawaka Golden Pride Sekenke
Tulawaka district development • 200 km. toBulyanhulu • 1 million oz.resource • grade of 19 g/t Tulawaka Bulyanhulu
Surface L 1+00 W L 6+00 W L 5+00 W L 4+00 W L 3+00 W L 2+00 W L 0+00 L 1+00 E L 4+00 E L 2+00 E L 3+00 E TRC 500 TRC 499 TRC 471 TRC 501 TRC 441 TRC 466 TRC 491 TRC 469 1200m El. TRC 470 TRC 505 TRC 467 TRC 487 TRC 503 TRC 488 TRC 512 TRC 510 TRC 507 TRC 509 TRC 504 TRC 506 TDD 50 TDD 21 TRC 498 TRC 490 TRC 514 TRC 489 TRC 502 TDD 28 TRC 513 TRC 511 TRC 508 1150m El. TDD 19 TDD 25 TDD 34 TDD 36 TDD 38 New Vein Area TDD 17 TDD 24 TDD 42 TDD 41 TDD 20 TDD 39 TDD 31 TDD 26 TDD 14 TDD 49 TDD 30 TDD 12 TDD 33 TDD 47B TDD 37 TDD 15 TDD 13 1100m El. Mineralized Zone TDD 29 TDD 16 TDD 27 TDD 32 TRC 485 1050m El. TRC 486 TDD 52W1 Mineralized Zone TRC 484 TDD 51 TDD 35 TDD 40 1000m El. 100 m 950m El. 900m El. proposed borehole intercept recent borehole intercept previous borehole intercept Tulawakalongitudinal section – east zone www www www www www www ww
Surface L 1+00 W L 6+00 W L 5+00 W L 4+00 W L 3+00 W L 2+00 W L 0+00 L 1+00 E L 4+00 E L 2+00 E L 3+00 E TRC 500 TRC 499 TRC 471 TRC 501 TRC 441 TRC 466 TRC 491 TRC 469 1200m El. TRC 470 TRC 505 TRC 467 TRC 487 TRC 503 TRC 488 TRC 512 TRC 510 TRC 507 TRC 509 TRC 504 TRC 506 TDD 50 TDD 21 TRC 498 TRC 490 TRC 514 TRC 489 TRC 502 TDD 28 TRC 513 TRC 511 TRC 508 1150m El. TDD 19 TDD 25 TDD 34 TDD 36 TDD 38 New Vein Area TDD 17 TDD 24 TDD 42 TDD 41 TDD 20 TDD 39 TDD 31 TDD 26 TDD 14 TDD 49 TDD 30 TDD 12 TDD 33 TDD 47B TDD 37 TDD 15 TDD 13 1100m El. Mineralized Zone TDD 29 TDD 16 TDD 27 TDD 32 TRC 485 1050m El. TRC 486 TDD 52W1 Mineralized Zone TRC 484 TDD 51 TDD 35 TDD 40 1000m El. 100 m 950m El. 900m El. proposed borehole intercept recent borehole intercept previous borehole intercept Tulawakalongitudinal section – east zone www www www www www www ww
gold zone TRC 253 bore hole intersection assay = g/t Au / m TDD 19 TRC 344 TRC 250 TRC 108 TRC 341 TRC 252 TRC 251 Talus zone surface laterite upper saprolite 6.48/5m 1.57/1m 1150m lower saprolite 4.90/8m VEIN B 153.97/2.69m VEIN A bedrock 8.36/4.22m 1100m 25.84/14m 25 m 11.10/1m 1050m 150 N 250 N 50 N Tulawakasection – 0+62.5W
Bulyanhulu district development • 21 licenses • 2,000 sq.km. Itetemia Bulyanhulu Buly South
significant RAB results RAB results drilled with core significant RAB results over reef 1 surface geology
1 km. 1 km. developmentdecember 31, 1998 reserves: 3.7 million oz.
1.2 km. 2 km. developmentdecember 31, 1999 reserves: 7.5 million oz. reserves & resources: >10.4 million oz.
2 km. 4 km. developmentaugust 31, 2000 reserves: 10.5 million oz. reserves & resources: >12.0 million oz.
2 km. KMC-7071.44 m Hthk@ 5.18g/t KMC–590D in progress KMC–640D2.56 m Hthk@ 25.11g/t KMC–699results pending KMC-689 2.42 m Hthk@ 25.85g/t KMC-727A resultspending KMC–693A3.78 m Hthk@ 6.34g/t KMC-615B 2.63 m Hthk@ 16.25g/t KMC-700E 2.48 m Hthk@ 19.42g/t september, 200020 drills working – 18 definition, 2 exploration
7 km. 2 km. september, 200020 drills working – 18 definition, 2 exploration KMC-7071.44 m Hthk@ 5.18g/t KMC-689 2.42 m Hthk@ 25.85g/t KMC-727A resultspending KMC–590D in progress KMC–699results pending KMC-700E 2.48 m Hthk@ 19.42g/t KMC–640D2.56 m Hthk@ 25.11g/t KMC-615B 2.63 m Hthk@ 16.25g/t KMC–693A3.78 m Hthk@ 6.34g/t
phase I development updategeneral overview • april 2001 startup • on budget
phase I development update infrastructure • 138 km powerline completed • water pipeline commissioned
phase I development update process facilities • construction of plant and infrastructure 67% complete • all major equipment ison site • mill startup 2001
phase I development update potential for expansion • 4,000 tonnesper day • 6,000 tonnesper day
phase I development update shaft sinking • production shaft at 320 meters • first station excavated • shaft in production in2Q, 2001 • three ventilation shafts completed
phase I development update underground development • 9,300 meters completed – 25% over feasibility • 3 Tanzanian development crews
phase I development update underground development • grades consistent – thickness 10% greater • 121,000 tonnes@ 16g/tonne stockpiled
phase I development update training / staffing • 50 Tanzanian development operators trained • 60 Tanzanians in training for process and maintenance • expatriate recruitment nearly complete
phase I development update community and environment • employee housing • World Bank environmental standards
2 km. 4 km. EASTphase II MAIN phase I
phase IIeast zone • 12/13 grams per tonne • 500-1000 tpd mining rate • adds 100,000 oz. to production • decline to begin early 2001 • 12 months to access ore
phase IIeast zone • 2002 program • delineate current reserve • carry out further exploration • begin development • 2003 production • $40 million capital expenditure
2 km. 4 km. EASTphase II MAIN phase I WESTphase III phase IV
phase IIIwest zone • surface drilling to date • greater widths / higher grades • requires main shaft to access zoneby drift phase IVdeep main zone • great holes at depth • develop later in decade
property summarypresent • total cash costs: $130 per /oz • total production costs: under $200 per /oz potential • increase reserves • reduce costs