100 likes | 378 Views
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea. CJK4_012. NGN-Working Group - Moderation and ToR -. Telecommunications Technology Association. Table of Contents. After last November proposal Temporary Agreed ToR Future Plan. After the last November CJK.
E N D
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea CJK4_012 NGN-Working Group - Moderation and ToR - Telecommunications Technology Association
Table of Contents • After last November proposal • Temporary Agreed ToR • Future Plan
After the last November CJK 1. Moderator and Contact points • Mission : Preparation of Building NGN-WG • Moderator : Chae-Sub,LEE (TTA) • Contact Point : Kazuo SASAKI(TTC), • Susumu SASAKI(ARIB), Liu DUO(CCSA) 2. Activity report of Correspondence Group • Proposed ToR : Prepared by Moderator • Review of ToR : Two Times • Result : Agreed to set up NGN-WG • Agreed at modified ToR
Temporary Agreed ToR 1. Rationale • Urgent needs for information exchange regarding NGN • Current NGN-related development in each country such as VoIP, • using BB access methods • Secure the end-to-end communication over the NGN • Note various worldwide NGN standardization activities(JRG-NGN, • NGN-PP and NGN-FG)
Temporary Agreed ToR 2. Objectives and Scope • Exchange information regarding NGN-related activities of each country, • e.g., BB access penetration, VoIP deployment, multimedia service, etc, • Respect the spirit of GSC9 resolution 9/2, NGN, accelerate the • standardization activities in each country and contribute to ITU-T, • where globally consistent NGN-related standards will be developed, • Regularly exchange the status of NGN-related standard development, • which should align with ITU-T global standards, in each country, • so that maximum commonality of NGN-related standards would be • achieved and consequently end-to-end multimedia service would be • provided over future NGN among CJK countries,
Temporary Agreed ToR 2. Objectives and Scope (cont’d) • Based on the draft NGN-related standards a series of conformance • testing could be planned among interested parties to confirm • interconnectivity and interoperability of NGN networks in order to assure • end-to-end service provision. • Collect information on NGN-related standards development in other • Asia-Pacific countries and other regions, and exchange it among CJK • countries to cooperate regionally and globally as well as to pursue • regional and global commonality.
Temporary Agreed ToR 3. Study Issues
Temporary Agreed ToR 3. Study Issues (Cont’d)
Temporary Agreed ToR 3. Study Issues (Cont’d) NGN Test-Bed • Principles and Frameworks for NGN Test-Bed • Test-Bed Requirements and Configuration Model • Systems Requirements and its Specifications • Interface Specifications • Test Scenarios and relevant Specifications • Others
Temporary Agreed ToR 4. Time Plan : Kick Off NGN-WG (July 2004) 5. Working Methos • Questions with target deliverables • Based on written contribution (before 3 days of the meeting) • Paperless Meeting 6. Proposed Structure Chair Secretary Test-Bed Sub-Gr. Tec. Coord. (Q1) Tec. Coord. (Q x)