50 likes | 135 Views
802.16m Closing Report. March 12, 2009 Vancouver, BC, CA Session #60. 802.16m Opening Report – Vancouver. Into Session #60 CRs on SDD 483 comments; 141 editorial, 342 technical (@ 3 minutes ea = 18 hrs) Approx 200 PHY, 143 MAC
E N D
802.16m Closing Report March 12, 2009 Vancouver, BC, CA Session #60 IEEE 802.16m-09/0017
802.16m Opening Report – Vancouver • Into Session #60 • CRs on SDD • 483 comments; 141 editorial, 342 technical (@ 3 minutes ea = 18 hrs) • Approx 200 PHY, 143 MAC • Approximately 103 associated contributions (@ 5 min ea. = 9 hrs) • Approx 25 PHY, 80 MAC • Call for Comments on Amendment Text • 229 comments; 180 Technical; 49 editorial (@ 3minutes ea. = 9 hrs.) • Virtually all PHY • Approximately 65 associated contributions ( 5 min ea. = 4.5 hrs.) • All PHY • Call for Contributions on Amendment text • 99 contributions (5 min. ea= 8.25 hrs) • 10 PHY, 89 MAC • Drafting Groups text • Included in amendment comments IEEE 802.16m-09/0017
802.16m Closing Report-Vancouver • Plan for the week: • Resolve all SDD comments on basic PHY and MAC functionality (Sect. 8, 10, 11, 19) sufficient for ITU submission and evaluation (primary focus) • CompletedAll resolutions recorded in comment database 802.16m-09/13r3 • Resolve Amendment Working Document (AWD) comments • CompletedAll resolutions recorded in comment database 802.16m-09/0014r3 • Establish Drafting Groups to review new Amendment Contributions and, if possible, develop initial text • Completed • New Drafting Groups created on Handover and Power Conservation • Old Drafting Groups on MIMO, Channel Coding and HARQ, UL Control, DL Control, Synchronization • All DGs met and developed new text for incorporation into the AWD • All approved new text incorporated into comment database 802.16m-09/0014r3 • Resolve remaining SDD comments/CRs on “ancillary” areas • CompletedAll resolutions recorded in comment database 802.16m-09/13r3 • Reviewed Draft ITU-R IMT-Advanced Templates IEEE 802.16m-09/017
802.16m Closing Report-Vancouver • Plans going Forward • New Drafting Groups Established on Handover, ARQ, HARQ Protocol, Power Conservation-Sleep/Idle, Connection Management/QoS, Power Control/Link Adaptation • SDD Call For Comments on all remaining FFSs and TBDs • AWD Call for Contributions on selected technical Areas • Reviewed and adopted proposed Workplan approach (slides 5,6,8) provided in C802.16m-09/0747r3 to be incorporated into current Workplan (802.16m-07/001r2) IEEE 802.16m-09/0017
802.16m Opening Report- Vancouver • Plan for the week (cont): • Logistics: • Conduct three simultaneous sessions • WG Interactive calendar shows TGm breakout schedule http://ieee802.org/16/meetings/mtg60 IEEE 802.16m-09/0017