1 / 6

802.16m Closing Report

802.16m Closing Report. July 15, 2010 San Diego, USA Session #68. 2010-07-15. 802.16m Closing Report – San Diego. Into Session #68: SB initial circulation: 81% return rate ; 58% approval SB Comments to be resolved at Session #68 on D6 Amendment Text ( 802.16-10/0040 ) 817 technical:

Download Presentation

802.16m Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 802.16m Closing Report July 15, 2010 San Diego, USA Session #68 802.16m-10/0021 2010-07-15

  2. 802.16m Closing Report – San Diego • Into Session #68: • SB initial circulation: 81% return rate; 58% approval • SB Comments to be resolved at Session #68 on D6 Amendment Text (802.16-10/0040) • 817 technical: • 466 MAC • 175 PHY • 13 General • 136 Other • 187 editorial comments • Hundreds of reply comments • 233 contributions • 135 MAC • 57 PHY • 11 Femto/SON • 2 Multi-BS MIMO • 10 Relay • 3 LBS • 10 e-MBS • 5 Other 802.16m-10/0021 2010-07-15

  3. 802.16m Closing Report- San Diego • Results for the week: • Met in parallel sessions on Tuesday and Wednesday and Thursday AM • Resolved ALL Sponsor Ballot comments (Congrats!!) • SDD CRs Withdrawn • Reviewed WorkPlan and schedule • Accepted Comment database 802.16-10/0040r2 and Authorized Editor to create D7 • Request initiation of SB recirc 802.16m-10/0021 2010-07-15

  4. 802.16m Closing Report- San Diego • Results for the week (cont): • 179 editorial • 825 technical & general • 369 Agree • 334 Principle • 301 Disagree • Current Ballot Status • 338 Voters (81% Return) • 152 Approve (58%) • 107 Disapprove • 16 Abstains 802.16m-10/0021 2010-07-15

  5. 802.16m Closing Report- San Diego • Motions to WG: • To approve the Session #68 resolutions to comments contained in 802.16-10/0040r2, and to authorize the editor to create a new draft P802.16m/D7 Moved by: Rakesh Taori Seconded by: Ron Murias Result: Approved by unanimous consent 802.16m-10/0021 2010-07-15

  6. 802.16m Closing Report- San Diego • Motions to WG: 2. To request the WG chair to initiate a recirculation SB on draft P802.16m/D7 in which the entire document is open for comment. Moved by: Lei Wang Seconded by: Ron Murias Result: Approved by unanimous consent 802.16m-10/0021 2010-07-15

More Related