90 likes | 229 Views
VISEUM UK PRESENTATION MAJOR SECURITY PROJECT ON TIME COMPLETION MANAGEMENT. The problems with major construction projects. The source of the problem.
E N D
VISEUM UK PRESENTATION MAJOR SECURITY PROJECT ON TIME COMPLETION MANAGEMENT
The source of the problem Recent study proved - the stakeholders, planners, designers, suppliers, the main contractor and sub contractors all use isolated project delivery systems, to deliver the same project.
How it works – capture information • Viseum UK delivers major security projects using the world’s only single-source global asset management system. This is a trusted and secure live online software system incorporating processes to solve all of these problems. • This software system is synchronised to the entire project supply chain’s proprietary systems to schedule project deliverables, manage equipment assets and control any project design change. Google Maps AutoCad
Project example • Once a major security project has been identified ($20m+), Viseum engineers meet and train the main stakeholders and all members of the project supply chain. • Each member’s proprietary systems (from CAD/scheduling/asset management systems, to in life PSIM systems, etc.) are then securely integrated into Viseum’s trusted single-source global management system. • All members then learn with pinpoint accuracy how to better understand their assets’ lives within the project; from design, through delivery, to in life operation. • Proven to deliver a major public security event for London 2012
Project results example £ 435 000 000 Example project cost £ 142 000 000 Value of security assets to be managed £ 42 000 000 Savings with better Asset awareness during installation
END www.viseum.co.uk