1 / 4

LBC BLUE CHANNEL: first test at LBT

LBC BLUE CHANNEL: first test at LBT. OVERVIEW. LBC BLUE CHANNEL: first test at LBT. 8lt x 53 h. 27 arcmin 0.27”/pix. LBC BLUE CHANNEL: first test at LBT. SKYTECH ccd controller: video + FPGA based seq. board. 4x500 KPixel/sec – RON= 10-15 e-. LBC BLUE CHANNEL: first test at LBT.

Download Presentation

LBC BLUE CHANNEL: first test at LBT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBC BLUE CHANNEL: first test at LBT OVERVIEW

  2. LBC BLUE CHANNEL: first test at LBT 8lt x 53 h 27 arcmin 0.27”/pix

  3. LBC BLUE CHANNEL: first test at LBT SKYTECH ccd controller: video + FPGA based seq. board 4x500 KPixel/sec – RON= 10-15 e-

  4. LBC BLUE CHANNEL: first test at LBT LAST WEEK! JUST TEST! (30 sec, blu filt.) (NO ACTIVE. OPT., NO ROTATOR & OPEN LOOP TRACKING)

More Related