An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE TECHNICAL UPDATE &ISIS/RAL PLANS

  2. Acknowledge Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA

  3. RAL & ISIS RAL Harwell ISIS

  4. Location Plant…. Control room… Electronics….

  5. ISIS Ring

  6. Experimental Hall Hall: L = 47 m W = 12 m H = 8 m S = 564 m2 V = 4512 m3 Two overhead cranes (8 tonnes each)

  7. Mice Hall Existing Area & Beam Line -- is still there - as seen in Summer -- Beam Line used to end of year

  8. Mice Layout

  9. Technical Update & Issues • Beam Line • RF System • Absorbers • Magnets & Cryogenics • Detectors • Infrastructure & Layout • RAL & ISIS Perspectives • Programme • Expected Progress

  10. MICE Layout

  11. Pm < 400 MeV/c Rejection of protons and pions <10% few muons per ms Two solutions: solenoid cryogenics availability release by PSI quadrupoles Beam Line

  12. Purity

  13. Performance Rate depends on muon momentum: e.g. at 200 MeV/c 3000 / ms for solenoid ~300 /ms in quadrupole (assumed a Ti wire target: 1cm long and 4mm Ø) Purity should be better than 90% against scattered protons

  14. Solenoid Magnet Cooling Channel Envelope RF Cavity Cavities Raft Absorber Tuning Bellows RF System 1 MW per cavity 8MW total Low Duty Factor 1-2 ms 1-10 Hz average power ~1kW/Hz

  15. RF Drive 7651 RS2058 EX SPS TH116 DRIVE TO 4 CAVITIES VIA PHASE SHIFTERS AND 70db COUPLERS POWER SPLITTERS AND CIRCULATORS TH781 EX RAL 4kW 10mW 40kW 4MW 400kW 12kV 5kV 40 kV 20 kV LEVEL CONTROL - a possible scheme ~ SOURCE OTHER DRIVE CHAIN R.A. Church RAL

  16. Liquid Hydrogen – Major safety issue ISIS Liquid Hydrogen Moderator Absorber I

  17. Absorber II

  18. Absorber III

  19. Absorber IV

  20. Magnets & Cryogenics Principle Issues – Fringe Fields – Cryogenic Requirements Blue contours: 10 mT Orange: 0.5 mT

  21. Detectors Issues: SiFi - Large cyro cooling needed for VLPCs TPG – HV & flamable gas (next to Lig.H cell)

  22. Infrastructure Plant: Electrical Power Cooling Power Cryogenic System Hydrogen Delivery & Handling Installation phased build of the experiment

  23. ISIS Perspective • Critical Issues: Beam Line • Long Shutdown • Break into ISIS Synchrotron from MICE Hall • Have Shielding available+ • Have Stands available • Competes with other ISIS projects • 300 mA upgrade* • Second Target Station* • RFQ Installation • delivery of contracted neutron amp.hours • * work in synch. vault +2nd target station – friend or foe?

  24. ISIS Schedule

  25. Expected Progress Proposal submitted expect the review to take place Mid Feb till May (?) - international review panel MICE is part of the UK’s Science road map - but funds are not yet allocated Internal Review  green light following international rp Management & Oversight Structure(s) need to be in place