90 likes | 211 Views
April 2012 Generation Resource Energy and Regulation Deployment Performance. QMWG 5/4/2012. NON-IRR GREDP – Energy Deployments. Resources below 85% threshold. IRR GREDP. Resources below 95% threshold. March IRR Failures. March IRR Failures (continued). GREDP Scenario Analysis.
E N D
April 2012 Generation Resource Energy and Regulation Deployment Performance QMWG 5/4/2012
NON-IRR GREDP – Energy Deployments Resources below 85% threshold
IRR GREDP Resources below 95% threshold
GREDP Scenario Analysis * April performance of frequency excluded intervals for NON-IRRs was 98.9% (73,983/74,891). The Std Dev was 3.2 MWs. * April performance of frequency excluded intervals for IRRs was 90.7% (2,042/2,251). The Std Dev was 6.2 MWs.
Daily Summary Graph • For this analysis, we captured unique HDL/LDL overrides • An override is considered unique if that same Resource did not have an override within the last 10 minutes • There was 1 unique override in April • As compared to 27 in March and 21 in February • The 1 override was related to issues with continuous SPS activation