70 likes | 179 Views
December 2012 Generation Resource Energy and Regulation Deployment Performance. QWMG 1/8/2013. NON-IRR GREDP – Energy Deployments. Resources below 85% threshold. * Failed intervals occurred during testing while using the Shutdown RST. IRR GREDP. Resources below 95% threshold. IRR >= 95%.
E N D
December 2012 Generation Resource Energy and Regulation Deployment Performance QWMG 1/8/2013
NON-IRR GREDP – Energy Deployments Resources below 85% threshold * Failed intervals occurred during testing while using the Shutdown RST
IRR GREDP Resources below 95% threshold