May 2012 Generation Resource Energy and Regulation Deployment Performance. QMWG 6/8/2012. NON-IRR GREDP – Energy Deployments. Resources below 85% threshold. IRR GREDP. Resources below 95% threshold. March IRR Failures. March IRR Failures (continued). GREDP Scenario Analysis.
E N D
May 2012 Generation Resource Energy and Regulation Deployment Performance QMWG 6/8/2012
NON-IRR GREDP – Energy Deployments Resources below 85% threshold
IRR GREDP Resources below 95% threshold
Daily Summary Graph • For this analysis, we captured unique HDL/LDL overrides • An override is considered unique if that same Resource did not have an override within the last 10 minutes • There were 8 total unique overrides in May • As compared to 1 in April and 27 in March
Reasons for Manual HDL/LDL Overrides • Outages required overrides as a result of local voltage issues • Also had voltage issues resulting from a severe storm • The following constraint had SCED executions counted towards irresolvability: • XMOS58 : ODNTH_FMR1 • This constraint has not met the criteria for resetting the shadow price cap