Rate Impacts of Various DSM Program Designs

Rate Impacts of Various DSM Program Designs. Dave Lamont EEU Budget Negotiations April 10, 2006. Model Design. Based on 2004 revenues and sales Losses attributed to Sales and DSM impacts are adjusted to VELCO Base load forecast assumes no new DSM after 2008

Download Presentation

Rate Impacts of Various DSM Program Designs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rate Impacts of Various DSMProgram Designs Dave Lamont EEU Budget Negotiations April 10, 2006

  2. Model Design • Based on 2004 revenues and sales • Losses attributed to Sales and DSM impacts are adjusted to VELCO • Base load forecast assumes no new DSM after 2008 • Base load growth (no DSM) assumed to be 1.5%

  3. Model Design • 2004 Base revenues separated into VY, HQ, and IPP plus “everything else” • Revenues are adjusted going forward for impacts of contract expirations as well as incremental market purchases and sales. “Everything else” escalated at inflation (2.5%) • Model used ICF avoided cost study, including ICAP cost projections

  4. Model Design • RR includes DSM budgets for ‘06 – ’08 • Revenue requirements (RR) adjusted for T&D expenditures above base peak load

  5. Scenarios • Model used DSM scenarios as presented by EVT at the 12/3/2005 workshop • A second set was developed which assumed 2008 savings levels continued through 2025 with costs escalated at inflation (2.5%) • Savings estimates incorporated EVT decay function • DSM costs expensed in each year

  6. Results • Rates increased • Revenue requirements (including DSM costs) decreased