1 / 11

A p r i l i s S a fe D iggin g M on th

Fo ll ow th e ABC G A. A p r i l i s S a fe D iggin g M on th. Fo ll ow th e ABC G A. Fo ll ow th e ABC G A. B ackg r ou n d. U nder both the rural and urban l and of A l berta li es an extens i v e i nfrastruc t ure of p i pes and cab l es

casta
Download Presentation

A p r i l i s S a fe D iggin g M on th

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FollowtheABCGA AprilisSafeDiggingMonth

  2. FollowtheABCGA

  3. FollowtheABCGA Background • UnderboththeruralandurbanlandofAlbertaliesanextensive infrastructureofpipesandcables • Today’ssocietydependsheavilyonthesafeoperationofall buriedfacilities,whichareestimatedtospanmorethan1,500,000 km inAlberta,including400,000kmofhighpressurepipelines

  4. FollowtheABCGA Background • Thesemany facilitiesinclude: • communications • electrical infrastructure • gas distribution • water • sewer • storm drainage • transmission pipelines • oil and gas production lines

  5. FollowtheABCGA Whatcanyoudo? Asacontractor,homeowner,orlandowner, youcan save time and moneywhilekeeping yourself,yourcommunity andyourprovincesafe by followinga fewsimplerules:

  6. FollowtheABCGA ClickBefore You Dig • FailuretoClickBeforeYou Digisthemostfrequent causeofdamagetoinfrastructure • Whatevertheprojectmaybe,planaheadandutilizethefree serviceofferedbyAlbertaOne-Call • DoyourPart: Dig with C.A.R.E.

  7. FollowtheABCGA Plantingatree, puttingupafence, or installingamailbox? Visitwww.ClickBeforeYouDig.comatleast2 workingdaysbeforeyouplantodisturbtheground AlbertaOne-Callwillnotifyburiedfacilityoperatorswhowill thensenda representativetomarktheirfacilities Youcansafelydig!

  8. FollowtheABCGA KeyMessages: • PlanAhead • ContactAlbertaOne-Callatleasttwoworkingdayspriortoanyground disturbance • Allow time for buriedfacilitiestobelocated • Respectthelocatemarks • Follow facility owner instructions to handexposeanyconflictingburiedfacilitiesbeforeusing mechanicalexcavationequipmentnearthem • Reportanydamagecausedorfoundtothefacilityowner • DIGWITHC.A.R.E.!

  9. FollowtheABCGA Benefits of Clicking over Calling Before You Dig • Available 24 hours • No waiting on hold • You can include a map of the exact location of where you need the locates In Case of Emergency or if you do not have access to a computer you can call 1-800-242-3447

  10. Check out the new nationwide portal to • Click on any province • Book your locate

  11. FollowtheABCGA As April is the traditional start-up of the annual digging season the ABCGA declares: Remember: Weareallresponsiblefor preventingdamageto Albertainfrastructureallofthe time. AprilisSafeDiggingMonth Please dig with C.A.R.E!

More Related