Outline for Today • Definition of Hydrodemolition • Different types of Hydrodemolition • Hydrodemolition Equipment • Applications for Hydrodemolition • Where Hydrodemolition is the preferred method of deteriorated concrete removal. • Issues with Conventional methods • Local Projects and where its used • Fast Track Structure Rehabilitation
Hydro Flow and Pressures • Basically there are 2 types of Hydrodemolition • High Pressure above 25,000 psi with low water flow rate of 25 gallons per min and less. • Low pressure approximately 15,000 psi and high water flow rates of 55 gallons per min.
Hydro means Water • Hydrodemolition water needs to be Clean and Potable due to the tight tolerances' of the pump units • Best option is to receive water directly from a fire hydrant • Trucking water is generally the second option • Filtration units can be used to draw from lakes and streams.
Hydrodemolition Equipment • Water Source • Power unit • Computerized robot • Carriage and protection shroud • Cutting nozzle and lance • Vacume Truck
Preferred Method for Rehabilitation • Total Surface Hydro to Remove Bad Concrete • Structural Concrete Overlays with Latex Modified Concrete • Flexibility of products depending on traffic • Largest overlay job in United States bid with this method.
Micro cracks and no bond is shown on a thin section after use of a jackhammer.
Fast-Track Bid Items • Scarification of deck Surface- SQ YD. • Total Surface Fast-Track Hydro-demolition to remove bad concrete- SQ YD • Placement of Latex Concrete Overlay at consistent Depth – SQ YD • Variable Depth Latex Concrete for quantities above the consistent depth- CUBIC YARD material cost only