1 / 11

C-1 Commuter parking lot

C-1 Commuter parking lot. Green median design . Problem statement.

chaela
Download Presentation

C-1 Commuter parking lot

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. C-1 Commuter parking lot Green median design

  2. Problem statement • This site suffers primarily from extreme erosion of the substrate under and around the bus stop platform and sparse native vegetation in the median. Poor storm water management and use of the bus stop and median by students perpetuate these problems.

  3. Main points • Inspiration: Downtown Aiken Greenways • Similarities • Differences • Main targets: erosion and soil exposure/stability • Main components of my proposal: • Redesign the existing bus stop • Recontour the terrain • Create a bioswale • Use native vegetation

  4. Bioswale diagram Source: ftp://ftp-fc.sc.egov.usda.gov/MT/www/technical/water/Bioswale.pdf

  5. Methods and Materials

  6. Benefits to campus • With the continued budget cuts facing the university, projects with long lasting benefits should be adopted. • By implementing such a public and visible project, Clemson can show its university community that it is serious about making big changes to the way projects are prioritized and initiated at Clemson. • If implemented, this project could certainly serve as a pilot study for other similar projects on campus.

More Related