1 / 27

Control Framework Working Group System Engineering Report October 29, 2008 Harry Mussman

Control Framework Working Group System Engineering Report October 29, 2008 Harry Mussman CF WG System Engineer hmussman@bbn.com. groups.geni.net GENI working group wiki. What is the GENI control framework?.

chaela
Download Presentation

Control Framework Working Group System Engineering Report October 29, 2008 Harry Mussman

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Control Framework Working Group System Engineering Report October 29, 2008 Harry Mussman CF WG System Engineer hmussman@bbn.com groups.geni.net GENI working group wiki www.geni.net

  2. What is the GENI control framework? Control framework includes: Clearinghouse Registries, each Aggregate Manager and users such as Researchers with their Experiment Control Tools, communicating via the Control Plane. www.geni.net

  3. Agenda • Goals • Introduction to WG SE and roles • Relevant Spiral 1 projects • Control Framework Architecture (CFA) document • Current CF issues • Planned CF documents • CF WG action items www.geni.net

  4. Goals(for this meeting) • Understand WG SE roles • Get overview of CF WG activities • Discuss work plan for coming year, and make suggestions • Recommend collaborators and authors www.geni.net

  5. Who am I? • Harry Mussman • Current: Senior Systems Engineer in the GPO at BBN • Last: Voice-over-IP architect at BridgePort Networks (a startup) and GTE Internetworking/Genuity • BSEE Univ Michigan, MSEE Northwestern Univ, PhD Stanford Univ • hmussman@bbn.com • GENI roles: • Control Framework WG SE • Opt-in WG SE • GPO coordinator for six Spiral 1 projects www.geni.net

  6. Role of the Control Framework WG SE • Frame technical issues from top-down • Collect issues from WG, compile and revise • Use to identify and structure WG documents • Synthesize input from bottom-up • Collect input from WG, and distribute • Look for and summarize consensus (or lack of it) • Draft WG documents… • Manage process to completion • Assist WG communications • Take and distribute notes • Maintain wiki www.geni.net

  7. How WG Creates a Document • SE drafts document • GPO does internal review • SE posts first draft • On wiki (to start); repository up RSN • WG discusses document on WG list • Possible one-on-one follow-ups • SE assembles changes, and revises • SE posts revision • (Repeat, until document completed) www.geni.net

  8. Agenda • Goals • Introduction to WG SE and roles • Relevant Spiral 1 projects • Control Framework Architecture (CFA) document • Current CF issues • Planned CF documents • CF WG action items www.geni.net

  9. GENI Spiral 1 Integration: Five Control Framework Clusters Cluster A Cluster B Cluster C Cluster D Cluster E 1609 DETER Trial Integ 1600 PlanetLab 1579 ProtoGENI 1582 ORCA/BEN 1660 ORBIT Framework 1613 Enterprise GENI 1601 Virtual Tunnels 1599 Vehicular Mobile Network 1657 WIMAX 1621 GUSH Tools 1646 CMU Testbeds 1602 Sensor/Actuator Network STUDY ALL PICK ONE 1604 GENI Meta Operations 1643 Programmable Edge Node 1622 Provisioning Service 1642 Instrumentation Tools 1633 Kansei Sensor Network 1632 Security Architecture 1645 Million- Node GENI 1658 Mid-Atlantic Crossroads 1628 Measurement System 1631 Embedded Real-time Measurements 1650 Regional Opt-In 1595 Great Plains Environment for Ntwk Innovation 1663 Digital Object Registry 1619 Optical Access Networks 1578 Overlay Hosting Nodes Highlighted Spiral 1 projects are central or highly relevant to Control Framework 1610 GENI at 4-Year Colleges Key: Column labels show common control framework 1653 Data Plane Measurements Projects with active Spiral 1 clearinghouse interfaces www.geni.net

  10. Spiral 1 Projects • Five Spiral 1 projects are focused on control frameworks for different clusters of projects: • 1609 DETER (Cluster A) • 1600 Planetlab (Cluster B) • 1579 ProtoGENI (Cluster C) • 1582 ORCA (Cluster D) • 1660 ORBIT (Cluster E) • Each is implementing Clearinghouse Registries, and reference software for an Aggregate Manager. • Three Spiral 1 projects are highly relevant to the CFs: • 1621 GUSH tools • 1632 Security Architecture • 1663 Digital Object Registry www.geni.net

  11. continued (2) • CF is highest risk item for Spiral 1. • Having five CFs: • Will mitigate risks. • Will bring unique contributions to the table. • Allows strengths to be identified, for inclusion in final CF. • Prevents the loss of good ideas. • Expect consolidation over time, but no “sudden death”. • How do we: • Clearly describe each CF, with a common vocabulary? • Understand similarities and differences? • Identify common issues, and get them resolved? • Work towards defining a “final” CF? www.geni.net

  12. Agenda • Goals • Introduction to WG SE and roles • Relevant Spiral 1 projects • Control Framework Architecture (CFA) document • Current CF issues • Planned CF documents • CF WG action items www.geni.net

  13. Control Framework Architecture Document • Drafted, and now ready for review by CF WG: http://groups.geni.net/geni/attachment/wiki/GeniControlFrameworkArchitecture/102008_GENI-ARCH-CP-01.4.pdf • Intent: • Clearly describe each CF, with a common vocabulary. • Understand similarities and differences. • Identify common issues. • A way towards defining a “final” CFA • Approach: • Separate the CFA into parts, indicating architectural options and current choices. • Provide multiple “worked examples”. • Provide a “linear” structure, to decompose the CFA, and be able to understand structure/features of each current CF implementation. www.geni.net

  14. continued (2) • Structure of document: • Start with system design overview to understand structure and concepts. (Section 3) • List features and functions that must be included. (Section 4) • Present control framework structure, including entities, interfaces, principals, services and objects. (Section 5) • Consider each interface, plus major concepts, and present examples of usage that walks through key scenarios. (Sections 6 – 11) • Include sections to summarize five current control frameworks being implemented for Spiral 1. (Sections 12 – 16) www.geni.net

  15. continued (3) • Shows current architecture choices: • Generally common to current implementations. • Control interfaces include APIs that follow a web services model, using SOAP and https (for a secure channel). • Principals (and services) have global identities, and are identified and authenticated with certificates from a PKI • Authorization is handled with signed tokens (certificates) that are passed from registry, to researcher, to aggregate, etc., based on an underlying trust management system. • Has allowed several architectural issues to be identified. www.geni.net

  16. Agenda • Goals • Introduction to WG SE and roles • Relevant Spiral 1 projects • Control Framework Architecture (CFA) document • Current CF issues • Planned CF documents • CF WG action items www.geni.net

  17. Identified Control Framework Issues • Issue 1: CFA includes authentication and authorization techniques that are strongly dependent on security architecture. • Are current choices reasonable? • What changes will have to be made as security architecture is formulated? • 1632 Security Architecture project will address this issue. • Who in WG is interested in this issue? www.geni.net

  18. continued (2) • Issue 2: Identity and authentication should include use of existing identity management systems, to permit easier federation • Which system(s)? InCommon? Others? • How can this best be done? • Who in WG is interested in this issue? www.geni.net

  19. continued (3) • Issue 3: CFA includes authorization techniques that are based on signed tokens. • This is fundamental to current CFA. • What needs to be done to properly verify signed tokens? • What needs to be done to properly verify the identity of offering principal (service)? • Can we be sure that this will work securely in a large scale system? • Who in WG is interested in this issue? www.geni.net

  20. continued (4) • Issue 4: CFA authorization mechanism is part of a larger trust management system. • Principals have “credential” (signed “trust assertion”). • Aggregate Manager accepts credential, and uses a local “policy checker” to decide whether (or not) to authorize resource assignment. • How does Policy Checker work? • Can it be extended to flexibly utilize new parameters and approaches? • How can trust management be established over diverse entities, to permit wide-ranging federation? • Who in WG is interested in this issue? www.geni.net

  21. continued (5) • Issue 5: Current CF implementations have clearinghouse registries (and related authority services) that vary. • From centralized to distributed. • With different arrangements of registries and related authority services. • Can one CFA accommodate them all? • How? • Who in WG is interested in this issue? www.geni.net

  22. continued (6) • Issue 6: Current CF implementations have different token flows for requesting resources, etc. • Can we identify and evaluate the differences? • Can we have a flexible arrangement for future extensions? • How does this interact with the resource description approach? • Is the current approach to an Rspec sufficient, or does it need to be extended? • Who in WG is interested in this issue? www.geni.net

  23. Next Steps for CFA Document • Continue to identify and address issues. • Fold solutions back into CFA document. • Provide a “linear” structure for the CFA. • To be able to decompose the CFA. • And apply to understanding the structure/features of each current CF implementation. • Continue reviews of CFA document, revise, and repeat until complete. • Who in WG is interested in helping? • Work toward v2 of CFA document, as we learn from Spiral 1 implementations. www.geni.net

  24. Agenda • Goals • Introduction to WG SE and roles • Relevant Spiral 1 projects • Control Framework Architecture (CFA) document • Current CF issues • Planned CF documents • CF WG action items www.geni.net

  25. Planned Control Framework Documents • Architecture: • CF Architecture, v1 DRAFT compete 10/17/08 • CF Architecture, v2 DRAFT due 6/16/09 • Subsystems: • Clearinghouse Subsystem Technical Description, v1 DRAFT due 2/15/09 • Clearinghouse Subsystem Technical Description, v2 DRAFT due 7/16/09 • Clearinghouse Subsystem Intfc Cntrl Doc, v1 DRAFT due 3/1/09 • Clearinghouse Subsystem Intfc Cntrl Doc, v2 DRAFT due 8/1/09 www.geni.net

  26. Control Framework Action Items • 1) • 2) • 3) • 4) • 5) www.geni.net

  27. Follow-up • Notes, slides, actions, etc will be sent to the working group mail list and posted on the wiki page: http://groups.geni.net/geni/wiki/GeniOptIn www.geni.net

More Related