1 / 12

Padma Mines and Minerals Corporation 2/391 A, Mambakkam Road Medavakkam Chennai -100

Padma Mines and Minerals Corporation 2/391 A, Mambakkam Road Medavakkam Chennai -100. About our Company Infrastructure. Company Area – 1.75 Acres (Total). Building Area – 40,000 Sqft. Open area for further extension – .75 Acres. Number of employees – 80 Nos. About our Company.

chargis
Download Presentation

Padma Mines and Minerals Corporation 2/391 A, Mambakkam Road Medavakkam Chennai -100

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Padma Mines and Minerals Corporation 2/391 A, Mambakkam Road Medavakkam Chennai -100

  2. About our Company Infrastructure • Company Area – 1.75 Acres (Total). • Building Area – 40,000 Sqft. • Open area for further extension – .75 Acres. • Number of employees – 80 Nos.

  3. About our Company • Company started in the year 1961,Manufacturing Hospital equipments • Started manufacturing of Deep draw components from 1962 • Expanded our capacity in 1971, Manufacture of Lub oil barrels • Shifted our Production from Lub oil barrels to Air Reservoir • Expanded our Hydraulic Pressing capacity in 2000 • ISO 9001:2000 QMS Certification during 2001 • Upgrade the QMS ISO/TS 16949: 2009 Certification from 2004 onwards • voir in 2000 Expanded our Hydraulic Pressing capacity in 2003

  4. Manufacturing Capability • Air Reservoir – 1 Ltr to 50 Ltrs • Air Dryer Housing & Desiccant Container • Drying & Distribution purge tanks • Purge tanks – 3.5L,5L & 7.5L • Press forming & stamping components

  5. Availability Machines • Hydraulic Press – 100 Ton – 2 nos. • Hydraulic Press – 150 Ton - 2 nos. • Hydraulic Press - 250 Ton - 1 nos. • Double action press – 250 Ton & 150 Ton – 1 no each. • Mechanical Power Press – 25 Ton to 250 Ton • Conventional Lathe – 4 ft to 10 ft • Hand Press 2 to 10 Ton • Drilling Machine – 1 Inch

  6. Availability Machines (Cont…) • Polishing Machine – 4 Nos • Shearing Machine – 1 No. • Surface Grinding Machine – 2 Nos • Tool and Cutter Grinder – 1 no.

  7. Facilities Available • In house Tool Room • 11 Tank Phosphate process and 7 tank process. • Paint Shop - 2 Nos • Powder Coating shop - 1 Nos • Oven - 4 Nos • Argon +Co2 Welding (MIG) - 7 Nos ( Semi automated) • SPM Welding - 1 Nos (Fully automated) • Chemical Lab ( Analysis of Phosphate chemicals) • Salt Spray Test Apparatus – 1 No • Training Hall • Standard Room • Computer system in all department • ETP – Effluent Water Treatment Plant • Genet 125 KVA – 1 No 250 KVA – 1 NO 160 KVA – 1NO • Compressor – 7 Nos

  8. Range of Products Air reservoir 1 Litre to 50 litres

  9. Range of Products Purge tank assembly ( Drying & Distribution Unit) Reservoir with mounting bracket - 3.5 litres

  10. Range of Products Press components (Brake Assembly components)

  11. Range of Products Components in Booster Brake assembly for LCV vehicles

  12. Thank you By PADMA MINES AND MINERALS CORPORATION 2/391A, MAMBAKKAM ROAD, MEDAVAKKAM, CHENNAI-100

More Related