100 likes | 225 Views
MICE Absorber Test Cryostat Plan-II. S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04. MICE Absorber Test Process. US/FNAL (3) Pressure Test at R.T. KEK (1) Pressure Test at R.T. with Dummy Windows (2) Pressure Test by G-He at 20 K with Dummy Windows. KEK (or FNAL)
E N D
MICE Absorber Test Cryostat Plan-II S. Ishimoto KEK MICE-AFC Phone Meeting, Aug-27, ‘04
MICE Absorber Test Process US/FNAL (3) Pressure Test at R.T. KEK (1) Pressure Test at R.T. with Dummy Windows (2) Pressure Test by G-He at 20 K with Dummy Windows KEK (or FNAL) (4) Pressure Test at R.T. with Windows (5) Pressure Test by G-He at 20K with Windows RAL (6) Pressure Test at R.T. (7) Cooling Test by G-He (8) Cooling Test by L-H2 (2)&(5) Needs Test Cryostat at KEK (7)&(8) Needs Test Cryostat at RAL?
MICE Absorber (Latest Drawing)
L-H2 Level Sensor Stay Off Lines
MICE Absorber Test Cryostat (Plan-I) To order this cryostat, we have to fix the detail design of absorber & cryostat.
MICE Absorber Test Cryostat (Plan-II) Test Item • Present f300 absorber test • MICE absorber test • Thermometer/level sensor calibration by Cryocooler • (Absorber test with Cryocooler)