100 likes | 237 Views
Madison Valley Stormwater Project Phase 2. Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80. Three Stormwater Pipeline Alignment Options. Open-Cut. Trenchless. Baseline. Selected Stormwater Pipeline Alignment. = Proposed shaft location .
E N D
Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80
Three Stormwater Pipeline Alignment Options Open-Cut Trenchless Baseline
Selected Stormwater Pipeline Alignment = Proposed shaft location = Stormwater pipeline
Existing Conditions in Washington Park Looking toward southwest corner of Washington Park View down into site from E Madison St Batting cage and south slope from lower lawn E Madison St streetscape Mixed-use building on E Madison St
Conceptual Landscape Details BALUSTRADE / ORNAMENTAL RAILING Concrete or Cast Stone Balustrade Metal Railing on Low Wall Metal Railing on Curb
Conceptual Landscape Details EXISTING STORAGE TANK FACADE Synthetic Stone Natural Stone Shotcrete Stone Veneer Stone Work in Washington Arboretum Upper Lawn Overlook with Ornamental Railing Stone Façade on Tank Rain Garden and Drainage Grate Sunken Lawn Meadow with Wooded Hillside Beyond