1 / 1

Pacific Connections Phase 2 Project Work

Pacific Connections Phase 2 Project Work. Notice: 33 trees will be removed under the Pacific Connections Phase 2 Project. These trees do not contribute to the horticultural collection. They are being removed as a management tool and to make way for the new Chilean garden.

trent
Download Presentation

Pacific Connections Phase 2 Project Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pacific Connections Phase 2 Project Work • Notice: 33 trees will be removed under the Pacific Connections Phase 2 Project. These trees do not contribute to the horticultural collection. They are being removed as a management tool and to make way for the new Chilean garden. • Location: Pacific Connections Garden - Chilean Immersion Forest • NE quadrant of intersection of Lake Wa. Blvd. and Arboretum Drive. • Timeframe: April 2010 • Safety: Service roads and trails near tree removal operations will be clearly signed “Closed” for this removal and a detour will be set up to route pedestrians around the removal. • Contact: Andy Sheffer, Seattle Parks and Recreation, for additional information. • E-mail: andy.sheffer@seattle.gov, Phone: 206.684.7041

More Related