Quick Update on Aeolus Preparations

Quick Update on Aeolus Preparations. Will McCarty Global Modeling and Assimilation Office, NASA GSFC. Since Last Update…. Efforts have been stopped since last update New LIPAS simulator has been obtained from KNMI Support for Continuous Mode operations

chin
Download Presentation

Quick Update on Aeolus Preparations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Quick Update on Aeolus Preparations Will McCarty Global Modeling and Assimilation Office, NASA GSFC

  2. Since Last Update… • Efforts have been stopped since last update • New LIPAS simulator has been obtained from KNMI • Support for Continuous Mode operations • R. Errico OSSE “control” has been expanded • two seasons • Improved AMVs • Still lacking: N19, MetOp-A, & GPSRO • Joint OSSE NR Cloud Verification paper in press

  3. Upcoming Studies • LIPAS upgrade will allow comparison of continuous and burst-mode operations in OSSE environment • Two seasons will allow a more concrete period of study • Errico control shows different behavior between DJF (previous) and JJA (new) seasons, with JJA season better matching reality • Observation impact studies (i.e. Zhu and Gelaro 2008) in addition to OSE/data denial • L2Bp processing, necessary for NRT assimilation, still under consideration -> package had to be reworked for CM