Construction and Structures 2 Tharindu Herath 500129564 Ludwig Mies van der Rohe “LESS IS MORE”
Construction and Structures 2 Base Plates Re-enforced Pad Footing
Construction and Structures 2 Universal Column Universal Column Primary Beam Primary Beam connection with End Plate
Construction and Structures 2 Primary Beam Secondary Beam
Construction and Structures 2 Primary Beam Angle Cleat Secondary Beam Secondary Beam connection to Primary Beam
Construction and Structures 2 Universal Column with end plate connection Primary Beam Secondary Beam
Construction and Structures 2 Bondeck Formwork Bondeck Formwork Bolted on to Secondary beam Secondary Beam
Construction and Structures 2 Concrete Slab Re-enforcement Bondeck Secondary Beam Ground Floor Slab with re-enforcement on Bondeck Formwork
Construction and Structures 2 View of Ground Floor
Construction and Structures 2 • First Floor Construction Process • Same as the ground floor • Primary beam on top of U.C. • Secondary Beams attached to Primary Beam • Bondeck formwork on secondary beams • Re-enforcement • Concrete slab
Construction and Structures 2 Re-enforced Suspended Ceiling connected with steel rods and attached to both the underside of the formwork and secondary beam Steel Rods Suspended Ceiling Re-enforcement
Construction and Structures 2 Roof Constructed the same way as the Ground & 1st Floor. Only difference is that there is a box gutter on the side of the roof
Construction and Structures 2 Bondeck Universal Column End Plate Secondary Beam Primary Beam Window Frame Glazing Concrete Cladding
Construction and Structures 2 “LESS IS MORE” Front View