An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLS Status Update E. Matias Canadian Light Source

  2. Layout 170.88 m circumference 2.9 GeV ~ 225-300 mADBA lattice with 12-fold period

  3. Major Facility Projects • Complete Phase II Beamlines • Start Phase III Beamlines • New Linac RF System • New Linac &Transfer Line Power Supplies

  4. Phase II - Under Construction B1/B2 - Indicates Bending Magnet Beamline 1 - operational in 2008 ID - Indicates Insertion Device Beamline

  5. BMIT Licensing Controls Related: • Safety System Design (Based on IEC 61508) • Human FactorsEngineering Review

  6. Phase III B1/B2 - Indicates Bending Magnet Beamline ID - Indicates Insertion Device Beamline 2 – CFI funded; not yet approved for construction.

  7. EPICS Environment • IOC Hardware • Motorola 68360 Single board computers (approximately 150) • Moxa IOCs (approximately 50) • VME 64x with SIS Optical Links (approximately 25-30) • CosyLab MicroIOC (3) • Many Server Based Soft IOCs. • IOC Software • Scientific Linux or RTEMS • EPICS 3.14.6 • High level Software • EDM, • Matlab, ROOT, + assorted packages • Web Services (next week) • PLC • Modicon Momentum (approximately 40) • Siemens S7/300 (4) • Siemens S7/400 (2) • Siemens S7 F (3)

  8. Controls and Instrumentation Development Specific Projects • Time-resolve/Single Bunch • Fill-pattern monitor (J. Vogt/J. Bergstrom) • EPICS Software (D. Beauregard) • Transverse Feedback System (S. Hu) • Upgraded timing system • Alarm Annunciation (D. Beauregard) • Beam profile analysis …… • Beamline Java Interface ….. • ScienceStudio/Remote Access …..

  9. Fill Pattern Monitor • Complete Phase II Beamlines • Start Phase III Beamlines • New Linac RF System • New Linac Power Supplies

  10. Results….

  11. Results….

  12. Audio Alarm (using Festival)

  13. Virtual PA System

  14. Funding Partners 38 supporting University Partners and growing…