An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HXMA BL Status Update@ CLS AUM 07June 15, 2007 • XAFS: operational; • Microprobe: opening for letter of intent; • Diffraction: under commissioning.

  2. XAFS Endstation • Status: operational: • Beam modes: Mono only & M-mono-M • General User program: successfully performing general users' experiments since Jan. 2007 • Detectors available & will be available: • Straight ion chamber (CLS); • Lytle (CLS); • Single element Vortex (CLS); • 4 elements Vortex (CLS); • Single Ge detector (CLS); • 32 element Ge detector (Graham & Ingird); • Low temperature sample environment: • ARS, MIN DE-202X-G-T (CLS); • Oxford, CF1208 (Helen);

  3. GU program (XAFS) Note: In cycle#5, 11 GU experiments have performed, 1 canceled because CLS machine failure.

  4. Beam time available for cycle#6 BL commissioning time?

  5. Diffractometer & microprobe 10 x 30 mm2 (V x H) Complete control of diffractometer, point detector and Vortex through spec@ software Beamsize 10 x 30 mm2 (V x H) with Rh coated KB mirror pairs Future development: GIXRD, DAFS, SEXAFS, Resonant Anomalous Scattering Sample environment: User interface optical lens system, data collection Beam size, flux, stability Target: Letter of Intent during cycle 8. Operational in cycle 9. Target: Operational in cycle 8 (2008)

  6. Microprobe commissioning 0 3200 microns Mapping the Umangite Mineral Commissioning exercise data R Cavell, March 2007 Spot size approx 20 mm, scan step 15 mm, Excitation energy 13500 eV, Vortex silicon drift detector. Area examined (and illustrated ) approx 3200 mm× 1600 mm Software by Sam Webb (SSRL) 4100 Se Fe 0 Co Selenium in Umangite (Cu3Se2) mineral specimen 4100 As Cu Cu (line) profile

  7. Long term Development Plan (1) Plan (1): 2nd mono @ POE

  8. Wiggler relocation and Plan (2) • Preliminary planed scheduled in October • Plan (1): 2nd ID source

  9. BL maintenance • BL optical component realignment after long shutdown: • Primary slits • Mirrors and mono • Mechanical: survey • Optical (mono only & m-mono-m modes); • Modification of BL BPMs @ Frontend (1) and pOE (2); • Collimating mirror conditioning for UV and soft x-ray;

  10. BL study and upgrade • X-ray beam stability at XAFS focus point (pressure, frequency of mono cooling LN2, cooling water, turbo pump…); • BL BPM @ sOE; • BL harmonic rejection mirror; • Mono 2 detune effect; • BL single element Ge detector; • BL single element Vortex detector; • BL 4 element Vortex detector BL maintenance, BL study and upgrade needs more 10% beam time.