1 / 6

Kick off drafting group on emissions 24/25 Febr. 2009

Kick off drafting group on emissions 24/25 Febr. 2009. Start of this enterprise: workshop Amsterdam May 2008 Conclusions were presented to Water Directors in June 2008 Water Directors agreed to start this activity, under umbrella WG E

chyna
Download Presentation

Kick off drafting group on emissions 24/25 Febr. 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kick off drafting group on emissions 24/25 Febr. 2009 • Start of this enterprise: workshop Amsterdam May 2008 • Conclusions were presented to Water Directors in June 2008 • Water Directors agreed to start this activity, under umbrella WG E • Main ojective: identify sources priority substances not sufficiently adressed by existing measures, significantly the cause of not reaching good status • Identify possible measures, concentrate on diffuse sources, point sources to be taken along when necessary • Mandate drafting group Endorsed in November-meeting Water Directors Kick off meeting drafting group emissions, Brussel, 24/25 Feb. 2009

  2. Mandate drafting group A. Identify priority substances for which diffue sources prevent reaching WFD-goals B. Identify potential measures at national/international level, based on substance-specific studies, adressing existing legislation and gaps. C. Discuss effectiveness and feasibility of measures D. Technical report integrating findings step A to C E. Technical report with potential measures, at level of MS and EU, contributing to cessation/phasing out of discharges, emissions and losses of PHS Kick off meeting drafting group emissions, Brussel, 24/25 Feb. 2009

  3. Aim of this meeting • Get an overview of available material • Discuss whether this is sufficient to move on to step D in the mandate. If not decide on steps to be taken: • what information should be gathered, with what type of method(s) • What time table, which process en what resources in time and money • Results in writing of activity sheets • Schedule of our future meetings Kick off meeting drafting group emissions, Brussel, 24/25 Feb. 2009

  4. Structure/organisation/timetabel • Steps A-C: led by MS and Commission with participation of stakeholders and selected experts • All expected to be active contributors to work: drafting text, participation in ad hoc meetings preferably organised by activity leaders • Drafting group itself sould be limited in number • Lead of activity: Netherlands, France and Commission • Progress is reported to/discussed in WG E and SCG • Final report tot WG E first half 2010, endorsement Water Directors in second half 2010 Kick off meeting drafting group emissions, Brussel, 24/25 Feb. 2009

  5. Agenda first day • 11.00-12.30: Presentations of content (substance)specific studies • 12.30-14.00: Lunch • 14.00-15.30: Presentations continued • 15.30-15.45: Break • 15.45-18.00: Discussion on gaps and steps to fill them up Evening program: diner for those interested, at Falstaff Kick off meeting drafting group emissions, Brussel, 24/25 Feb. 2009

  6. Agenda second day • 9.00-16.00, venue: room BU, room 0A • 9.00-10.00: Summary by chair • 10.00-11.00: Discussion on what, how, by whom and when, writing of activity sheets • 11.00-11.15: Break • 11.15-12.30: Discussion continued • 12.30-14.00: Lunch • If necessary 14.00-15.00: Discussion continued • 15.00-15.30: Schedule next meetings • 15.30-16.00: Any other business Kick off meeting drafting group emissions, Brussel, 24/25 Feb. 2009

More Related