New MPTS Analysis for 2008

New MPTS Analysis for 2008. B.P. LeBlanc PPPL 22-DEC-2008. MPTS Run for 2008. Polarizer in place for the first time Reduces background radiation, but saturation remains a problem First run with in-situ window calibration Window coating observed and measured Two laser shutdowns

cira
Download Presentation

New MPTS Analysis for 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New MPTS Analysis for 2008 B.P. LeBlanc PPPL 22-DEC-2008 BPL_22DEC08_1

  2. MPTS Run for 2008 • Polarizer in place for the first time • Reduces background radiation, but saturation remains a problem • First run with in-situ window calibration • Window coating observed and measured • Two laser shutdowns • Measures now in place to improve reliability • Phase-3 calibration done after the run • New analysis performed BPL_22DEC08_2

  3. New MPTS Analysis for 2008 • Phase-3 channel calibration for 2008 • Change Te @R=54.5cm • Software modification to add extra time points under background light saturation • In-situ window calibration • Increase ne about 10% at end or run • Increase Te within error bar • Valid array (ntime, nrad) • Valid>0 means ok BPL_22DEC08_3

  4. Phase-3 2008 CalibrationMain change seen at R=54.5cm BPL_22DEC08_4

  5. Background Light SaturationSignal hits digitalization maximum BPL_22DEC08_5

  6. Software Modification for Saturation Condition BPL_22DEC08_6

  7. What Happened after 0.6s?Neutron signal consistent with Te drop BPL_22DEC08_7

  8. Output Array VALID (ntime,nrad)Has same dimensions as Tef, etc. • VALID=1 c2 ok • VALID=2 c2 ok with background sat • VALID=3 c2 ok,but with bckgd-sat “repair” • VALID=-1 c2 too high • VALID=-2 c2 too high with bckgd sat • VALID=-4 c2 ok, but dTe > Te BPL_22DEC08_8

  9. Effects of in-situ Window CalibrationLast run day shot 130730 @0.49s Valid Te increase within error bar ne increase about about 10% BPL_22DEC08_9

  10. Window Coating Correction and Saturation Remedial BPL_22DEC08_10

  11. Effects of in-situ Window CalibrationLast run day shot 130730 @1.22s Valid BPL_22DEC08_11

  12. Effects of in-situ Window CalibrationLast run day shot 130730 around 1.2s New time point Valid BPL_22DEC08_12

  13. Valid Array is Part of MPTS Outputts function has been modified IDL> help,ts(130730),/str "Best" analysis is of "Preliminary" quality ** Structure <93cdd7c>, 20 tags, length=131644, data length=131642, refs=1: SHOT LONG 130730 TIME FLOAT Array[31] RADIUS FLOAT Array[30] DR FLOAT Array[30] TEF DOUBLE Array[31, 30] NEF DOUBLE Array[31, 30] PEF DOUBLE Array[31, 30] DTEF DOUBLE Array[31, 30] DNEF DOUBLE Array[31, 30] DPEF DOUBLE Array[31, 30] RS FLOAT Array[101] TES DOUBLE Array[31, 101] NES DOUBLE Array[31, 101] PES DOUBLE Array[31, 101] LD DOUBLE Array[31] LASER INT Array[37] RR DOUBLE Array[37, 30] VALID INT Array[31, 30] DATE_AN STRING 'Mon Jul 14 16:17:37 2008' COMMENT STRING 'ldc=11 ldr=11 sph=1 002x geom:[Ishelf[0:15'... IDL> BPL_22DEC08_13

  14. Valid_viewer Application (1) Phase 1 Phase 2 Phase 3 BPL_22DEC08_14

  15. Valid_viewer Application (2) Phase 1 Phase 2 Phase 3 BPL_22DEC08_15

  16. Valid_viewer Application (3) Phase 1 Phase 2 Phase 3 BPL_22DEC08_16

  17. Concluding Remarks • New analysis will be loaded to MDS soon • During the Holidays • Valid array • Valid > 0 indicates ok, • but caveat emptor when valid=3 • Window coating effects were corrected based on the in-situ calibration • Effects seen at end of the run on Te and ne • Correction meaningful at the of the run BPL_22DEC08_17