Rajasthan State Wide Area Network ( RajSWAN ). June 2, 2011. RAJASTHAN STATE WIDE AREA NETWORK ( RajSWAN ). Objectives Provide vertical and horizontal communication infrastructure Achieve e-Governance commitment Bring governance closure to public
E N D
Rajasthan State Wide Area Network (RajSWAN) June 2, 2011
RAJASTHAN STATE WIDE AREA NETWORK (RajSWAN) Objectives Provide vertical and horizontal communication infrastructure Achieve e-Governance commitment Bring governance closure to public Provide efficient service delivery system Strengthen disaster management capacity
Implementing Agency (RSWAN Operator) Consortium of Bharti Aitel Ltd., Jaipur - Lead Bidder Bharti Airtel Services Ltd. Trimax IT Infrastructure & Services Ltd.
Three layer Hierarchical Structure- Vertical Segment Three layer hierarchical architecture
RajSWAN Architecture - Vertical Segment 281 Points of Presence (PoPs) State Headquarter at State Data Centre, Jaipur 33 District Headquarters at Collectorates/ Zilla Parishads 247 Block Headquarters at Panchayat Samiti/ Rajiv Gandhi Seva Kendra offices
RajSWAN Architecture - Horizontal Segment Connecting 3381 offices across the state • Offices of 18 departments to DHQ except Jaipur • Offices of 11 departments with BHQ PoP • 33 collectorate offices with DHQ • 4 GoR offices at New Delhi to SHQ RajCOMP Info Services Ltd.
Horizontal Segment- District Level Offices • Ground Water Development (GWD) • Commercial Tax Department (CTD) • Registration and Stamps • Medical and Health • Social Welfare • Transport • Tourism • District Collectorate Office (Over OFC) Vidyut Vitran Nigam Limited (VVNL) Agriculture Department PHED PWD Irrigation Co-Operative Department Industries Education Forest
Horizontal Segment- Block Level Offices • Irrigation • Education • Vidyut Vitran Nigam Limited (VVNL) • Forest • Agriculture Department • Commercial Tax Department • Tehsil Head Quarter Office Sub Divisional Magistrate (SDM) Block Development Officer (BDO) Police Circle Office PHED PWD
Action at District level • Nodal Officers to be appointed at district and block levels • District level nodal officer – minimum rank of ADM/CEO • Block level nodal officer – Block Development Officer or equivalent • Guidelines intimated to district collectors latest vide letter No. 4.3(137)/ RajCOMP/ Tech/ 2007/ 162 dated May 6, 2011
PoP Site Requirements • Civil work and furniture • Room size minimum of min 10*10 sq. ft. • Provision for Diesel Generator. • Height of finished room - minimum 9.00 ft. • Proper electrification and lighting • One storage almirah with locking system
PoP Site Requirements • Civil work and furniture (Contd…) • Provision for 2 seats with tables and chairs • Proper room renovation • Provision for installation of split/ window AC • Room should be lockable and should have Single door entry. • Wall mounted Cabinet Racks • Wall fitted Gas based Fire extinguishers
PoP Site Requirements- Contd... • Electrical work and electrical equipments • Separate Single phase Power Connection with sub-meter for 10KW power consumption. • Specified power requirements • Power Points • Electrical distribution box • Earth Pit (for all the basic electrical connections)
Fund Allocation for Site preparation • Funds transferred to districts based on the number of Tehsils at the rate of Rs. 110,000/- per tehsil and Rs. 150,000/- per DHQ (Total – Rs. 2.75 Crores) • Communication vide letter No. F5(202)/ DoIT&C/ Tech/04/138 dated January 19, 2007. • Funds to be utilized for site preparation at • District Headquarters • Block Headquarters RajCOMP Info Services Ltd.
Webpage Details and updates available at the RISL website www.rajcomp.net/ RajCOMP Info Services Ltd.
Status of Site preparation and Appointment of Nodal Officers