1 / 20

Rajasthan State Wide Area Network ( RajSWAN )

Rajasthan State Wide Area Network ( RajSWAN ). June 2, 2011. RAJASTHAN STATE WIDE AREA NETWORK ( RajSWAN ). Objectives Provide vertical and horizontal communication infrastructure Achieve e-Governance commitment Bring governance closure to public

Download Presentation

Rajasthan State Wide Area Network ( RajSWAN )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rajasthan State Wide Area Network (RajSWAN) June 2, 2011

  2. RAJASTHAN STATE WIDE AREA NETWORK (RajSWAN) Objectives Provide vertical and horizontal communication infrastructure Achieve e-Governance commitment Bring governance closure to public Provide efficient service delivery system Strengthen disaster management capacity

  3. Implementing Agency (RSWAN Operator) Consortium of Bharti Aitel Ltd., Jaipur - Lead Bidder Bharti Airtel Services Ltd. Trimax IT Infrastructure & Services Ltd.

  4. Three layer Hierarchical Structure- Vertical Segment Three layer hierarchical architecture

  5. RajSWAN Architecture - Vertical Segment 281 Points of Presence (PoPs) State Headquarter at State Data Centre, Jaipur 33 District Headquarters at Collectorates/ Zilla Parishads 247 Block Headquarters at Panchayat Samiti/ Rajiv Gandhi Seva Kendra offices

  6. Horizontal Segment

  7. RajSWAN Architecture - Horizontal Segment Connecting 3381 offices across the state • Offices of 18 departments to DHQ except Jaipur • Offices of 11 departments with BHQ PoP • 33 collectorate offices with DHQ • 4 GoR offices at New Delhi to SHQ RajCOMP Info Services Ltd.

  8. Horizontal Segment- District Level Offices • Ground Water Development (GWD) • Commercial Tax Department (CTD) • Registration and Stamps • Medical and Health • Social Welfare • Transport • Tourism • District Collectorate Office (Over OFC) Vidyut Vitran Nigam Limited (VVNL) Agriculture Department PHED PWD Irrigation Co-Operative Department Industries Education Forest

  9. Horizontal Segment- Block Level Offices • Irrigation • Education • Vidyut Vitran Nigam Limited (VVNL) • Forest • Agriculture Department • Commercial Tax Department • Tehsil Head Quarter Office Sub Divisional Magistrate (SDM) Block Development Officer (BDO) Police Circle Office PHED PWD

  10. Action at District level • Nodal Officers to be appointed at district and block levels • District level nodal officer – minimum rank of ADM/CEO • Block level nodal officer – Block Development Officer or equivalent • Guidelines intimated to district collectors latest vide letter No. 4.3(137)/ RajCOMP/ Tech/ 2007/ 162 dated May 6, 2011

  11. PoP Site Requirements • Civil work and furniture • Room size minimum of min 10*10 sq. ft. • Provision for Diesel Generator. • Height of finished room - minimum 9.00 ft. • Proper electrification and lighting • One storage almirah with locking system

  12. PoP Site Requirements • Civil work and furniture (Contd…) • Provision for 2 seats with tables and chairs • Proper room renovation • Provision for installation of split/ window AC • Room should be lockable and should have Single door entry. • Wall mounted Cabinet Racks • Wall fitted Gas based Fire extinguishers

  13. PoP Site Requirements- Contd... • Electrical work and electrical equipments • Separate Single phase Power Connection with sub-meter for 10KW power consumption. • Specified power requirements • Power Points • Electrical distribution box • Earth Pit (for all the basic electrical connections)

  14. PoP Site Requirements- Contd…

  15. PoP Site Requirements- Contd…

  16. Fund Allocation for Site preparation • Funds transferred to districts based on the number of Tehsils at the rate of Rs. 110,000/- per tehsil and Rs. 150,000/- per DHQ (Total – Rs. 2.75 Crores) • Communication vide letter No. F5(202)/ DoIT&C/ Tech/04/138 dated January 19, 2007. • Funds to be utilized for site preparation at • District Headquarters • Block Headquarters RajCOMP Info Services Ltd.

  17. Webpage Details and updates available at the RISL website www.rajcomp.net/ RajCOMP Info Services Ltd.

  18. Status of Site preparation and Appointment of Nodal Officers

  19. Thank You

More Related