Work plan of KNU for ATF2

Work plan of KNU for ATF2.  Men power E-S Kim : ATF2 Beam dynamics S-H Shin : Design and fabrication of IP-BPM and S-band BPM H-S Kim : Fabrication of IP-BPM Y-S Hwang : Design and fabrication of IP-BPM electronics (Graduate student)

clancy
Download Presentation

Work plan of KNU for ATF2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work plan of KNU for ATF2  Men power E-S Kim : ATF2 Beam dynamics S-H Shin : Design and fabrication of IP-BPM and S-band BPM H-S Kim : Fabrication of IP-BPM Y-S Hwang : Design and fabrication of IP-BPM electronics (Graduate student) H-J Kim : Design and fabrication of IP-BPM electronics I-M Hwang : Experimental studies in ATF partly (New post-doc from March 2007)  Budgets - KNU has budgets of FY2006 to FY2008 for the R&D of ILC accelerator (~2000MYen/Y). - KNU will also submit proposals for R&D of ILC accelerator to KOSEF and KRF in March 2007. We expect that the budgets in FY2007 will be increased more than the present and thus we need to consider another R&D items that may be performed after completion of S-Band BPM. - KNU R&D peoples for ILC accelerator and detector have a R&D meeting in 6th Dec.. After this meeting, we may inform more detailed accelerator R&D plans in FY2007.

  2. Work plan of KNU for ATF2(R&D items)  Beam dynamics R&D  Studies of final optics and beam tuning in ATF2  Experimental studies in ATF  Instrumentation R&D  IP-BPM - Body : design / fabrication / electrical testing - Electronics : design / fabrication /electrical testing  S-band BPM - Body : design / fabrication / electrical testing

  3. Work plan of KNU for ATF2(Schedule)  IP-BPM - body : design (S-H Shin) until Dec. 2006 at KEK : fabrication (S-H Shin, H-S Kim) starts in Dec. 2006 at Korea - Electronics : design (Y-S Hwang ) (5 Jan. -25 Feb. at KEK) : fabrication (Y-S Hwang, H-J Kim) starts in March 2007 at Korea  S-band BPM - body : design (S-H Shin) (1. Feb.~28 Feb. 2007 at KEK) : fabrication (S-H Shin, H-S Kim) starts in March 2007 at Korea

More Related