1 / 17

MICE CM 32

MICE CM 32. Wrap UP. Step IV “Almost There”. We Must “Keep Our Eyes on the Prize”. But. All Magnets MUST WORK! No Mistakes, No risk taking, We get no MORE Mulligans! Then: Assembly and integration of all the subsystems in limited space this year is a challenge!

clay
Download Presentation

MICE CM 32

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE CM 32 Wrap UP

  2. Step IV“Almost There” We Must “Keep Our Eyes on the Prize” MICE CM 32 February 8-11, 2012

  3. But

  4. All Magnets MUST WORK! • No Mistakes, No risk taking, We get no MORE Mulligans! Then: • Assembly and integration of all the subsystems in limited space this year is a challenge! • Integration/Engineering activity needs better communication. • Positioning of magnetic-field sensitive equipment is now highly critical. MICE CM 32 February 8-11, 2012

  5. What are the implications of this? We can sleep When we are Dead* *Apologies to Warren Zevon who is, unfortunately, now sleeping

  6. Instrumentation, DAQ, Online, Offline, Analysis • Target operations and Development • Projections indicate stable and long-term running in MICE • Cerenkov, TOFs, KL, Trackers • Ready to Go (Mostly) • EMR • On Track • DAQ, Online, Monitoring and Analysis • All making Excellent progress MICE CM 32 February 8-11, 2012

  7. Step IV…. Magnets, Magnets, & more Magnets* *Plus some explosive bits

  8. Spectrometer Solenoids • First SS ready for leak check in 2 weeks • Arrives at RAL mid-June • Second in close pursuit • Arrives at RAL late August MICE CM 32 February 8-11, 2012

  9. AFC MICE CM 32 February 8-11, 2012

  10. LH2 System R&D complete and Test cryo decommissioned – June 12 MICE CM 32 February 8-11, 2012

  11. And then a bit of magic*…. *I mean much hard work!

  12. Step IV Goal: Make this graphic a Photo - Christmas ‘12 MICE CM 32 February 8-11, 2012

  13. And then, there will be no sleep, even when we are Dead (tired)

  14. MICE CM 32 February 8-11, 2012

  15. Step VI My Goal: Photo Christmas ’15± MICE CM 32 February 8-11, 2012

  16. “May you live in exciting Times”* • The next 9 months WILL be exciting! • And we all hope very rewarding • 2013 WILL yield the first cooling measurements • And prepare the way for MICE – the Final Frontier *Chinese curse? - 寧為太平犬,不做亂世人 níngwéitàipíngquǎn, bùzuòluànshìrén MICE CM 32 February 8-11, 2012

  17. On To CM 33 Next time: Haggis, deep-fried Snickers and Single-Malt Apologies to Yordan MICE CM 32 February 8-11, 2012

More Related