160 likes | 265 Views
Final Intern Presentation. 6 August 2008 • Jordan Budisantoso. Office Recycling. 46 Cubicles Goal: 2 Weeks. Construction = Limited Space => Slight Delay Currently have 2 Roll-offs Ad Campaign/Kick-off Event. 3 Bins (We have 1 need 2 more) Cardboard + Paper Plastic + Aluminum + Glass
E N D
Final Intern Presentation 6 August 2008 • Jordan Budisantoso
Office Recycling • 46 Cubicles • Goal: 2 Weeks
Construction = Limited Space => Slight Delay Currently have 2 Roll-offs Ad Campaign/Kick-off Event 3 Bins (We have 1 need 2 more) Cardboard + Paper Plastic + Aluminum + Glass Trash Office Recycling
Plant Recycling • 60 drums per hour • Drum Size: 32.8lbs • 27-30 Drums per 3yd Bin • Self-tipping hoppers dump into Roll-offs
Changeover Checklists (Supporting Hanieh) • Created Checklist Template as well as actual checklists for equipment
Bill of Materials • Supporting Tim & Nien in building a (BoM) for equipment for replaceable parts
Floor Map (Supporting Rudy) • Per Rudy’s specifications, created a floor map (not to scale) to accommodate his needs for estimating the max number of pallets of corrugate he can have
Written Quote from Valley Vista Services • At full capacity, plant produces an average of 2,500 empty drums per week. • At estimated $105.00 per ton (quote provided by Valley Vista Services), this equals an approximate$17,325 in metal rebates per month. FREE!!!
Goals Accomplished • Planning of Office Recycling Program • Completed Recyclable/Waste Table • Finalized pick-up proposals with Valley Vista Services • Mapped out recycling area