260 likes | 283 Views
OVERVIEW & PROGRESS. Presentation before the Sub Collector cum Sub Divisional Magistrate, Cuddalore. Introducing the Township. Quintessential Middle Class Dream 530 Houses Middle Class Socio-economic strata Mostly first time House owners.
E N D
OVERVIEW & PROGRESS Presentation before the Sub Collector cum Sub Divisional Magistrate, Cuddalore
Introducing the Township • Quintessential Middle Class Dream • 530 Houses • Middle Class Socio-economic strata • Mostly first time House owners. • Vibrant Community, Significant Senior Citizen population • Residents from all over India
PURA – in spirit • Former President A.P.J. Abdul Kalam’s dream project • Provide urban amenities in rural areas (PURA) • Provides direct and indirect employment and livelihood support to six villages nearby, atleast 500 households benefit. • Designed to be an Integrated Township
Civic Requirements Roads & Lighting Sewage & Drainage Waste management Security
The Sewage Issue • Land Allocated and Transferred to Government • Sewage Treatment Plant Built according to Specifications • Poor sustainance
GoI References • The Manual on Sewerage and Sewage Treatment. 1993. Prepared by the CentralPublic Health and Environmental Engineering Organisation (CPHEEO), • Urban Sanitation in India—Planning for a Better Future. Urban Sanitation PlanningGuidance Notes. Ministry of Urban Dev • Guide to City Sanitation Planning. Ministry of Urban Development.
Legislature • 74th Constitutional Amendment Act, 1992Responsibility for the planning and delivery of urban services, including sanitation, lies withurban local bodies under local municipal laws and the 74th Constitutional Amendment Act,1992. • The Environment (Protection) Act, 1986 • The Tamil Nadu District Municipalities Act, 1920
Indian Standards • IS 1172:1993 – Basic requirements for water supply, drainage, and sanitation. • IS 12314:1987 – Code of Practice for sanitation with leach pits for rural communities. • IS 2470 (Part 1):1985 – Code of Practice for installation of septic tank: design criteria and construction. • IS 2470 (Part 2):1985 – Code of Practice for installation of septic tank: secondarytreatment and disposal of septic tank effluent. • IS 9872:1981 – Precast concrete septic tanks. • IS 5611:1987 – Code of Practice for waste stabilization ponds (facultative type). • IS 10261:1982 – Requirements for settling tanks (clarifier equipment) for wastewatertreatment. • IS 13496:1992 – General requirements for suction machines for cleaning sewers, manholes and so on
Progress Report • Requested about 10 Companies Providing STP services for Feasibility, Techinical and Commercial proposal. • Five have already responded, Inspected present STP and given their Technical & Commerical proposals • Four more will be presenting soon.
Plan Ahead • We request for District Administration for assistance for expert evaluation and shortlisting of the technical proposals. • (ANY) Assistance in carrying out the STP operationalisation project • Concurrent Regularisation of the Layout (Individual plots / township)
Cost of the Project • Between 30 to 60 Lakhs • To be financed by the Community – to Seek Assistance from Government. • Require help in Monitoring