Fermilab Test Beam Facility. Aria Soha All Experimenter’s Meeting January 27, 2014. Latest Experiments. Dec 18 T-1041 CMS Forward Calorimetry T-979 secondary user T-994 finish up (Until Dec 20) Dec 26 T-1041 ( contnd ), Jan 2 DAMIC took data for SiPMs Beam studies –
E N D
Fermilab Test Beam Facility Aria Soha All Experimenter’s Meeting January 27, 2014
Latest Experiments • Dec 18 • T-1041 CMS Forward Calorimetry • T-979 secondary user • T-994 finish up (Until Dec 20) • Dec 26 • T-1041 (contnd), • Jan 2 • DAMIC took data for SiPMs • Beam studies – • plateaued Scintillator & Cherenkov PMTs; • started Ckov pressure scans • Jan 8 – 21 • Si Strip Telescope commissioning http://www-ppd.fnal.gov/FTBF/schedule http://www-ppd.fnal.gov/FTBF/
Current Status • T-1042 (g-2) taking data • MCenter Control Room construction • MC6 Magnets replaced • MC2 Quad replacement • Other LAriaT work http://www-ppd.fnal.gov/FTBF/
Up Coming Experiments • Feb 5 – 26 super PHENIX • T-1044 – 5 ton Hadron calorimeter • T-1048 – Time-of-flight system • T-1037 – (FLYSUB) GEM detectors • T-1054 pre-shower calorimeter http://www-ppd.fnal.gov/FTBF/schedule http://www-ppd.fnal.gov/FTBF/
TSW’s In Progress Technical Scope of Work • T-1018, approved • T-1042, approved (taking data) • T-1044, approved • T-1048, collecting signatures • T-1049, waiting on experimenter feedback • T-1054, extreme processing • One more, waiting for T-number http://www-ppd.fnal.gov/FTBF/TSW http://www-ppd.fnal.gov/FTBF/
Additional Slides http://www-ppd.fnal.gov/FTBF/