1 / 16

Update on Power Supplies and GTK carrier M.Morel 01 .04.2014

Update on Power Supplies and GTK carrier M.Morel 01 .04.2014. Power Supplies Cables GTK_carrier Probe tester. Power Supplies Cables GTK_carrier Probe tester. Low Voltage A3009 and A3009K modules. 1 x 2V5 Dig 1 x 3V3 Dig 1 x 5V Dig. 1V2 Dig x 10 ch. 1V2 A X 10 ch.

conway
Download Presentation

Update on Power Supplies and GTK carrier M.Morel 01 .04.2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Power Supplies and GTK carrier M.Morel01.04.2014

  2. Power Supplies • Cables • GTK_carrier • Probe tester Update on Power Supplies and GTK_carrier

  3. Power Supplies • Cables • GTK_carrier • Probe tester Update on Power Supplies and GTK_carrier

  4. Low Voltage A3009 and A3009K modules 1 x 2V5 Dig 1 x 3V3 Dig 1 x 5V Dig 1V2 Dig x 10 ch 1V2 A X 10 ch 3 x 5V3 Dig 1 x A3009 2 x A3009K + 1 x A3009 Common to the 3 stations. Supplies the Temp logic (VDD_temp and 3V3_NI) 3 modules in each EASY crate Interlocked with Temperature (OR of cooling and TDCpix) Update on Power Supplies and GTK_carrier

  5. What do we need? • - 3 x EASY CRATES 3000 • 6 x 3009K 3 x Analog and 3 x Digital 1V2 • 1 x 3009K (prototype module) • 3 x 3009 2V5, 3V3, 5V • 1 x 3009 5V3 non interlocked* • 1 A3486 48V power supply • 1 mainframe SY2527: 80CHF/month • 1 branch controller A1676A: 40CHF/m • 1 HV module A1821: 38CHF/m • 1 SY4527: 5862 euros (profitable after 7 years) • 1 A1676A: 1800 euros (profitable 5 years) • 1 A1821: 5260 euros (profitable after 14 years) Bought Rented Bought * 5V3 non interlocked is connected to rad hard voltage regulators which provide VDD_temp (1V2) and temp_logic (3V3) Update on Power Supplies and GTK_carrier

  6. Power Supplies • Cables • GTK_carrier • Probe tester Update on Power Supplies and GTK_carrier

  7. TCC8 Update on Power Supplies and GTK_carrier

  8. Electrical cables routing scheme Patch Panel1 GTK Station 1 4m Electronic Rack 1 Patch Panel2 18m Electronic Rack 2 GTK Station 2 9m 20m 4m Each Patch Panel: 10 x 1.2V Digital 10 x 1.2V Analog 1 x 3.3V Dig 1 x 2.5V Dig 1 x 5V Dig 1 x Analog senses 1 x digital senses 1 x 5.3V dig (NON interlocked) 1 x Bias (~500 to 1000V) 1 x 10 temperature interlocks Electronic Rack 3 Patch Panel3 GTK Station 3 4m Update on Power Supplies and GTK_carrier

  9. All the cables have been ordered • All the connectors and accessories have also been ordered • The company CONFECTRONIC (Yvonand) will assemble the connectors (318 cables) Update on Power Supplies and GTK_carrier

  10. Power Supplies • Cables • GTK_carrier • Probe tester Update on Power Supplies and GTK_carrier

  11. GTK_CARRIER Update on Power Supplies and GTK_carrier

  12. PCB production • Due to the complexity of the PCB, we would select a company capable to work with special techniques as: • Small pitch • Blind and burriedvias • Controlled impedance • Filled and capped vias • Nelco4203-13 • Ni/Au on the edges of the board • countersink • CERN. • GS Swiss PCB. KÜSSNACHT (CH) www.swisspcb.ch • ELTOS SAN ZENO Arezzo (IT) www.eltos.it • STEVENAGE circuits www.stevenagecircuits.co.uk Update on Power Supplies and GTK_carrier

  13. GTK_CARRIER production CERN. 2 x 2866CHF + tooling 1039CHF GS Swiss PCB. 3 x 6103CHF + 2935CHF ELTOS SAN ZENO 3 x 1485CHF + 1500CHF STEVENAGE circuits no answer 5 boards will be produce: expected delivered time: mid May Update on Power Supplies and GTK_carrier

  14. Power Supplies • Cables • GTK_carrier • Probe tester Update on Power Supplies and GTK_carrier

  15. Wentworth Prober Missing part: small vacuum pump Needs modification of the carrier support Update on Power Supplies and GTK_carrier

  16. Conclusion • Status of the Power Supplies: ordered • Status of the Cables: ordered • Status of the GTK_carriers: ordered • Prober: needs small modifications Update on Power Supplies and GTK_carrier