Update on Power Supplies TB 16.3.06 L.Jirden

Update on Power Supplies TB 16.3.06 L.Jirden. LV Concerns Orders & deliveries Maintenance HV Overview purchasing. LVPS overview. Wiener PL500/F12 TPC CERN contract? TRD CERN contract? PHOS CPV MU TRK MU TRG Arem Pro SDD non-CERN contract. Caen EASY SPD FMD PMD ACORDE

ollie
Download Presentation

Update on Power Supplies TB 16.3.06 L.Jirden

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Power SuppliesTB 16.3.06 L.Jirden • LV • Concerns • Orders & deliveries • Maintenance • HV • Overview • purchasing

  2. LVPS overview Wiener PL500/F12 TPC CERN contract? TRD CERN contract? PHOS CPV MU TRK MU TRG Arem Pro SDD non-CERN contract Caen EASY SPD FMD PMD ACORDE SSD non-CERN contract HMPID non-CERN contract Caen SASY TOF non-CERN contract Caen SY1527 T0 non-CERN contract? V0

  3. USERS: No PS TPC 20 TRD 50PHOS 6CPV 3 MU-TRK 30MU-TRG 6TOTAL ~ 115 Wiener PL500/F12 MAIN CONCERNS:- OPC Server not yet ready- Long delivery delays CR4 UX Ethernet water cooled 230 VAC 1ph 3U 2-8V:10A25A 50A100A 5-15V:10A20A

  4. USERS: No cratesSPD 6FMD 1PMD 6ACORDE 1HMPID 3SSD 18TOF 36TOTAL ~70 Ethernet 1527LC 4U A1676 FILTER 3U 380 VAC 3ph A3486 3U 48 VDC 6U Caen EASY CR4 UX MAIN CONCERNS:- Power factor + harmonic rejection too low- Efficiency too low- Radiation tolerance too low- Connectors & mechanical issues- long delivery delays 5-15V:20A 2-8V:9A25A50A100A

  5. Orders and delivery - Wiener • Test Samples • TPC, MTG, MTK ordered 7 units in Aug/Sept 05 • Not yet delivered – not before 24 March 06 • Bulk order • MTK, and PHOS ordered in Jan 06, TPC & TRD ? • CERN negotiating production & delivery plan • All empty bins asked to be delivered mid May • Patch panel mounted and cabled by CERN • Rack mounting prototype being prepared in demonstrator rack Bldg 4 • Installation in UX racks June/July • 1 PS of each type to each detector to be delivered July • To enable commissioning to start • Bulk delivery end September • Final installations November • Reception + tests • Delivery to CERN ESS group (if wished) • Unpacking, entry into support dBase • Reception tests with semi-automatic tester

  6. Orders & delivery - Caen • Test samples • None ordered • Bulk order • SPD,FMD,PMD,ACORDE, HMPID ordered all, TOF & SSD ? • Caen need to finalize the systems before production and delivery • Filter unit to be tested by CERN next week • Radiation tests no good; very tedious, but not critical for ALICE • Deliveries (on CERN contract) earliest end September 06 • Installation: earliest November • Commissioning: other devices to be found • Reception • Delivery to CERN ESS group (if wished) • Unpacking, entry into support dBase • Reception tests

  7. Maintenance • On-site maintenance and repair foreseen • To avoid possible problems due to INB • Done by Caen & Wiener • Organized and handled by CERN ESS group

  8. HVPS overview

  9. HVPS purchasing • No common purchasing done • Each detector to take care of their own orders • Order via Institute or via CERN • Via CERN: contact D.Gregorio, CERN Purchasing • Time to order now • Common effort and support for control part • OPC server, Framework components, etc