An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RESERVE ANALYSIS FUNDING REQUIREMENTS & METHODS TO MEET THEM

  2. RESERVE FUND-WHY WE HAVE IT • A SEPARATE FUND TO MEET FUTURE CAPITAL EXPENDITURES FOR THE ASSOCIATION • TO PROTECT THE ASSOCIATION FROM AN UNFORSEEN CAPITAL EXPENDITURE OR AN EMERGENCY EVENT • A BY-LAW REQUIREMENT

  3. WHAT ARE THE RESERVES’ CAPITAL OBLIGATIONS • CURBS AND GUTTERS • SIDEWALKS • DETENTION POND • STREETS: MAINTENANCE & REPAIR

  4. WHY RESERVE STUDY WAS INITIATED • DID NOT KNOW THE SCOPE OF THE ASSOCIATION’S CAPITAL RESPONSIBILITIES-PARTICULARLY STREETS • DID NOT KNOW THE AMOUNT OF FUNDS NEEDED TO COVER THE MAINTENANCE OF THESE ITEMS

  5. RESERVE STUDY-RESULTS • ASSESSED THE CURRENT STATUS OF THE RESERVE FUND & FUNDING LEVELS • CONCLUDED THAT THE RESERVE IS CURRENTLY UNDERFUNDED TO MEET PROJECTED FUTURE EXPENSES • CONTENT IS A BLUEPRINT-A TOOL-USED TO PROJECT FUTURE FUNDING LEVELS • PROPOSED THREE SCENARIOS TO MEET FUTURE FUNDING • GIVES THE STATUS OF CAPITAL ITEMS

  6. RESERVE STUDY SCHEDULE OF CAPITAL EXPENDITURES

  7. RESERVE FUND-CURRENT & PROJECTED STATUS

  8. PROJECTED YEARLY BALANCES FOR CURRENT LEVEL OF SAVING & INVESTMENT RETURNS

  9. Status of capital items WHAT WE NEED TO DO & WHEN

  10. CURBS & GUTTERS • BASICALLY IN GOOD CONDITION • A FEW NICKS HERE & THERE • NO MAJOR EXPENSES IN NEAR FUTURE

  11. SIDEWALKS • WALKING PATHS IN GOOD CONDITION-MINOR REPAIRS ONGOING AS NECESSARY • GAPS BETWEEN SIDEWALK & CURB NEED IMMEDIATE REPAIR-A LIABILITY ISSUE SIDEWALK APRON CURB

  12. DETENTION POND • GENERALLY GOOD • CLEARING AROUND GRATING NEEDS TO BE ADDRESSED WITHIN THE NEXT YEAR • GENERAL CLEAN-UP ON YEARLY BASIS

  13. STREETS-ASPHALT SEAL & REPAIR • STREETS ARE FOR MOST PART IN GOOD CONDITION • NEED TO IMPLEMENT AN ASPHALT CRACK SEALING PROGRAM • INTERSECTION AT RIVERBED AND VALLEY STREAM NEEDS IMMEDIATE ATTENTION

  14. STREETS-REFACING CURBS • STRONGLY ADVOCATED BY OCRC AND BIRMINGHAM SEALCOAT • DISCOURAGED BY ULTIMATE CONCRETE • SUPPOSEDLY LENGTHENS THE LIFE OF STREET STREET CURB ROUTE & INSERT SEALER

  15. REFACING CURBS: EXAMPLE • COST: $15,000-$20,000 • DURATION: 5YRS+ FROM ULTIMATE SEAL-10YRS+ FROM BIRMINGHAM SEALCOAT • PURPOSE IS TO PREVENT DAMAGE BETWEEN STREET & CURB SHERMAN STREET

  16. PROS & CONS ON REFACING CURBS PROS • COULD LENGTHEN LIFE OF STREETS • COULD POTENTIALLY DELAY COSTLY RESURFACING CONS • ULTIMATE CONCRETE HAS DOUBTS ABOUT PROCESS • IS NOT WIDELY PRACTICED • EXPENSE • PERSONAL OBSERVATION

  17. PARK STREET-EXAMPLES OF REFACING CURBS-A NEGATIVE RESULT

  18. BOARD INITIATIVES TO RESERVE STUDY RESULTS • FORM A COMMITTEE TO VERIFY CONCLUSIONS • HAVE THE COMMITTEE CHOOSE A METHOD FROM THE RESERVE STUDY TO BEST MEET FUTURE FUNDING

  19. RESERVE COMMITTEE • COMMITTEE CONSISTED OF • JOHN VON ALLMEN • RICHARD WOODMANSEE • MIKE GOULD • JEFF BUCHOLZ • PURPOSE: • ASSESS THE RESULTS OF THE RESERVE STUDY RECOMMENDATIONS • ASSESS THE CONDITION OF ASSOCIATIONS’ CAPITAL ITEMS • RECOMMEND A FUNDING METHOD TO MEET FUTURE CAPITAL EXPENSES

  20. THREE SCENARIOS TO MEET FUNDING NEEDS • STEPWISE INCREASES • 24% ANNUAL INCREASES TO RESERVE FUND PORTION OF ASSOCIATION DUES • ADDITIONAL ASSESSMENTS

  21. STEPWISE INCREASES

  22. STEPWISE CHART

  23. CONCLUSIONS OF COMMITTEE • ALL WERE IN AGREEMENT THAT A FUNDING SOLUTION TO ADDRESS THE RESERVE SHORTFALL SHOULD BE IMPLEMENTED IMMEDIATELY • FOUR CAPITAL PROJECTS SHOULD BE ADDRESSED IMMEDIATELY • FIRST: SIDEWALK SEPARATION AT CURBS • SECOND: CRACK & SEAL OF ASPHALT • THIRD: CLEARING OF DETENTION POND • FOURTH:SOLICIT BIDS FOR REFACING OF CURBS

  24. WHERE DO WE GO FROM HERE? • RECOGNIZE THAT THE COMMON ELEMENTS ARE OUR RESPONSIBILITY COLLECTIVELY-WHICH INCLUDES ROADS • RECOGNIZE THAT CURRENT DUES ARE NOT SUFFICIENT TO MAINTAIN THE COMMON ELEMENTS IN THEIR CURRENT CONDITION • STRIKE A BALANCE BETWEEN THE NEEDS OF THE COMMUNITY TO THE ABILITY OF THE HOMEOWNER TO PAY • RE-ASSESS ON A YEARLY BASIS-USING SPREADSHEET AS A MONITORING TOOL