An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Severity 4 & 5 observations Oct. ’2010 East Region

  2. Total severity 4 and 5 observations for the month of Oct.’10:- 37 Nos.

  3. Severity 4 :- 100 T crawler crane was marching with load on an inclined surface.(Tata Steel LD#3) (Model-II)_ East Action Taken:-Activity was stopped & decided to shift material in part-wise till trailer deployed.

  4. Severity 4 :- Man Basket was being used for erection work.(CSP) (Model-III )_ East Action Taken:-Activity was stopped & Man Basket discarded.

  5. Severity 4 :- “C” channel was kept on the purlin without securing. (Suraj Logitix_Jamshedpur) (Model-III)_ East Action Taken:- “C” channel removed.

  6. Severity 4 :- Manual splicing sling was being used for gable end column erection.(Jaypee) (Model-III)_ East Action Taken:- Sling discarded.

  7. Severity 4 :- Short height vertical ladder without fall arrester was being used for access to the after.(Jaypee) (Model-III)_ East Action Taken:-Ladder height extended 1 mtr. above from column also fall arrester provided.

  8. Severity 4 & 5 observations Oct. ’2010 West Region (Maharashtra)

  9. Total severity 4 and 5 observation for the month of Oct.’10- 39 nos.

  10. Severity 5- Electrical Bare wire found on roof without plug sockets .( Ampacet- Empire) (Model-III) _West- MAHA. Action Taken:- Activity stopped immediately. Explain importance of Plug &Socket & same was provided.

  11. After Before Severity 5- Scaffold Wheel found with out Locking arrangement . (Ampacet-Empire) (Model-III)_West Action Taken:-. Wheel with locking arrangement provided immediately.

  12. After Before Severity 5- Electrical wire routed throughout ground. (Ampacet-Empire.) (Model-III)_West-MAHA Action Taken: Wire routed through 3mtr up by Pipe immediately.

  13. Severity 5- GAS Cutting Set found w/o FBA at Church gate Extn. work.(Church-Gate Extn.- Sai Project.) (Model-II) _West Action Taken: Asked Builder to provide it immediately. (Closed)

  14. Severity 5 – Oxygen Cylinder used for shifting primary structure Manually.(ChurchGate Extn.-Mumbai-Sai Project)_ (Model-II) West -Maha Action Taken:- Asked Builder staff provide 6inch pipe pieces for same.

  15. Severity 4- Improper access at Indo Euro & rigger found w/o PPEs (Indo Euro- Suryodaya.) (Model-II)_West MAHA Action Taken: Activity stopped and Asked Builder to provide scaffold as per checklist. (Closed)

  16. Severity 4 & 5 observations Oct.’2010 West Region (Gujarat)

  17. Total severity 4 and 5 observation for the month of Oct.’10- 24 Nos

  18. Severity 5- Electrical bare wire used & wooden Board w/o Weather protection.(Jindal SS -R.K. Builder) (Model-II) _West _GJ Action Taken:- Work was stopped and asked to changed the board & provide proper plug top.

  19. Severity 5- Riggers was descending by using Girts.(Siemens- Mundra) (Model-II)West- GJ. Action Taken:-Work was stopped & Boom Lift Provided Immediately.

  20. Severity 4- Hole Bari was just fixed instead of bolt. (Siemens –Mundra) (Model-II)_West –GJ Action Taken:- Work was stopped & hole bari removed and proper connection was done.

  21. Severity 4- T-Rafter were erected w/o Life line Pole . (Welspun –Anjar) (Model-III)_West -GJ Action Taken:- Work was Stopped & corrected immediately.

  22. Severity 4 & 5 observations Oct.’2010 TN Region

  23. Total severity 4 and 5 observation for the month of Oct.’10- 34 Nos

  24. Severity 4-: Worker found standing and working on girts and hooking his safety harness to a clit- Perlos (Model-II)_TN Action Taken: Activity stopped and instructed supervisor to monitor closely while workers are working at height and to provide lifeline and proper access.

  25. Severity 4-: Worker found standing on scaffolding pipes and working –Perlos (Model-II) _TN Action Taken: Activity stopped and instructed supervisor to provide working plat forms.

  26. Severity 4-: Workers found working on non standard scaffolding and using single lanyard safety harness – Sheenlac (Model-II) _ TN Action Taken: Activity stopped & instructed supervisor to provide working platform and ensure that the workers are using standard PPE. (Closed)

  27. Severity 4-Electric wires found directly inserted into the distribution board . – Sheenlac (Model-II) _ TN Action Taken: Activity stopped & asked to procure standard distribution board and to used plugs.

  28. Severity 4-: Workers found working at height without any fall protection– Sheenalc site (Model-II) _TN Action Taken: Activity stopped & PPEs provided.

  29. Severity 4-: Loose sheets found unattended on the roof – Sheenlac site (Model –II) _TN Action Taken: Loose sheets and other material secured and asked builder site supervisor to maintained same.

  30. Severity 4-: Column erected on footing without proper supports .- Sindhuja (Model-II) _TN Action Taken: Activity stopped & Colum secured by four guy rope and instructed supervisor to follow safe erection methodology.

  31. Severity 4-: Material found shifted without guide ropes- Sindhuja (Model-II) TN Action Taken: Activity stopped & instructed supervisor to used guides ropes while shifting material

  32. Severity 4-: Worker found not anchoring safety harness to a fixed support & area below sharp edge materials found. - Perlos (Model-II) _TN Action Taken: Activity stopped. Life line provided &housekeeping done and to barricaded the area .

  33. Severity 4-: Below are is not barricaded while height work is in progress - SCL (Model-II)_TN Action Taken: Activity stopped & instructed supervisor to barricade the area whenever height is in progress

  34. Severity 4 & 5 observations Oct. ’2010 AP &K Region

  35. Total severity 4 and 5 observation for the month of Oct.’10- 19 Nos

  36. Severity 4 & 5 observations Oct. ’2010 North Region

  37. Total severity 4 and 5 Observations for the month of Oct.’10:- 08 Nos.

  38. Severity 4-: Trust were not supported and barricaded . – (Siemens _Haryana )(Model-II)_ North Action Taken: Activity stopped and support provided and barricading done.