500 likes | 722 Views
The Very Near Future . Main structures now complete. Classrooms and central House Base. House Base with full glass elevation. Space between will form a house garden. Classrooms. Outside area between classrooms . Classroom. Internal – Classrooms being made. House Base.
E N D
Main structures now complete
Space between will form a house garden
Outside area between classrooms
House Base looking back to the central dome
Looking out from the ground Floor House Base
Artists impression – view from 1st floor towards central dome, LRC and Digital Media Studios
Let’s Take a look Inside the central area
View from 2nd floor Into central area where the LRC will be
Stairs to 3D Lecture Theatre
House bases Academy+
Stairs to TV, Radio and AV Studios
View from inside the Canteen To the outdoor eating area
View from 2nd floor science to the TV, Radio and AV Studios
In addition • We will keep these areas that will • be refurbished: • Assembly Hall • with tiered theatre seating • Arts Centre Music with new layout • New Technology block in current • Art rooms
And don’t forget • Extensive playing fields • All weather pitches • Allotment • Full wireless coverage • Bicycle racks • Pedestrian only entrance • New ID badges with proximity cards for Library, Canteen and printing