An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Facilities Modernization Program Funded by Measure B Project Report May 21, 2012

  2. PROJECT PROGRESS REPORT Student Services & Central Administration LAS POSITAS COLLEGE May 21, 2012 • Project Team: • Architect: Steinberg Architects • Construction Manager: Parsons Brinckerhoff • Contractor: Zovich Construction • Project Update: • Storefront installation is complete. Glazing is 95% installed in the Storefronts. • Curtainwall installation is complete. Glazing is 75% installed in the Curtainwalls. • Interior framing is 95% complete. Sheetrock installation and taping on the 2nd floor is 80% complete. Single side of sheetrock is underway on the 1st floor. • Data cable is continuing to be pulled throughout the second floor. • Elevators installation has started. • Mechanical units were delivered and installed on the roof. Ducting is underway. Occupancy: Spring 2013

  3. PROJECT PROGRESS REPORT Science Building, Phase II LAS POSITAS COLLEGE May 21, 2012 • Project Team: • Architect: Kwan Hemni • Construction Manager: Parsons Brinckerhoff • Contractor: Broward Builders, Inc • Project Update: • Interior Casework, Lighting and Fume hoods are installed. • Ceiling Tiles are installed in all rooms, Power to building complete, Elevator installed • Stair Treads and Guardrails are completed. • Greenhouse installed. • Exterior and Interior Painting is complete. Restrooms completed. • 2nd floor classrooms are completed, with furniture staged. • Storefront installation and Glazing Completed. • Exterior Hardscape and Flatwork is being completed. Occupancy: 09/2012

  4. PROJECT PROGRESS REPORT Campus Boulevard Phase I-III LAS POSITAS COLLEGE May 21, 2012 • Project Team: • Architect: Gates & Associates • Construction Manager: Parsons Brinckerhoff • Contractor: Suarez & Munoz Construction, Inc. Project Update: • Project was Bid on March 13, 2012 and Contractor was Board Approved April 17, 2012. • Construction Starts May 29, 2012 • Occupancy: 10/2012

  5. PROJECT PROGRESS REPORT Photovoltaic System Phase II LAS POSITAS COLLEGE May 21, 2012 • Project Team: • Design Build Contractor: Cupertino Electric Inc. • Construction Manager: Parsons Brinckerhoff Project Update: • Fencing Completed. • Racking System and Array installation is completed. • Inverters and Transformer installed and completed. • New Switchgear tie in May 20, 2012. • Operational: February 2012