Overview • Introductions • Special Thanks • Purpose of Forum • Summary of Past Forums • 2007 Expectations
Special Thanks:CT/ Industry Joint Committee Jeff Abercrombie, ACM – Districts 5,6,10 Ken Bocchicchio, ACM – Districts 7 s/e,12 Bill Corn, Balfour Beatty Construction Andre Catellier, MCM Construction Inc. Rich Hebert, CC Myers Brian Maple, FCI Constructor, Inc. Mike Halverson, Facilitator
Purpose of Forum • Share information & concerns • Collect ideas and suggestions • Improve practices and relationships • We’re here to communicate!
Overview of Past Forums • 2001, 2002, 2005 Forums • 2006 Forums Action Items • Joint committee of Industry/ OSC Managers • Surveys mailed (for topics) • Workshops (from popular response areas) • Management Panel (2006)
2001 Topic Workshops • Falsework practices • Flyash/ bridge deck cracking • Training OSC staff • Support/ Authority of OSC staff
2002 Workshops • Innovations for Acceleration • Quality Control & Quality Assurance • Welding • Bridge Surveying practices
2005 Forum Topic: Falsework Construction Safety • Falsework Erection and Removal • Falsework Grading and Jacking • Column Cage Construction & Guying Plans
2006 Workshops • Cost Reduction Incentive Proposals • Work Window Restrictions • Bridge Construction Acceleration • The Human Factor
2006 Forums Action Items: • New signed CRIP “Decision Document” • DES process for proposed changes • CRIP concept review team • CRIP process facilitator • Conceptual assessment within 10 days • Facilitator coordinates formal review • DES Deputies panel review • Lessons learned shared
2006 Forums Action Items: • Work Window Restrictions: • Update design & construction checklists • “Environmental Commitment Summary” with bid documents • Project tours for Environmental and Traffic Operations staff
2006 Forums Action Items: • Bridge Construction Acceleration: • Standard waste slab designs/ metal deck forms • Precast structural bridge elements • Option to eliminate haunch at top of retaining walls • New BCM on sharing concrete trial batch compressive strength test results
2006 Forums Action Items • Human Factor: • Pilot “End of Job Satisfaction” surveys • Partnering Presentations • ACM brown bag lunches (all-staff) • Bid Item for “Contractor-furnished RE Office Trailer”
2007 Forum Expectations • New Ideas and Action Items for Improvements • Management Panel for open discussion • Feedback on value of Forums