An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News from ELAN SC of CARE CERN September 2006 F. Richard LAL/Orsay

  2. Outline • The ELAN workshop in Orsay • Discussions in view of FP7 • ILC at Vancouver • ELAN documents F. Richard LAL/Orsay

  3. F. Richard LAL/Orsay

  4. Electron Accelerator R&D for the Energy Frontier • CARE/ELAN on May 15: - Plenary in the morning on laser/plasma, a proposal for a new infrastructure on SC, Progress in CLIC cavities, BDYN+INSTR… - FP7 1h30 discussion in the afternoon followed by a working party (ELAN Doc. 2006-04) - 4 Parallel ELAN sessions for 3h30 • EUROLEAP kick-off meeting on May 16 • In // EUROTEV on May 16 • Conclusions May 17 EUROLEAP F. Richard LAL/Orsay

  5. Plenary • Introduction: LAL Director • Laser plasma accelerators: achievements and plans (20') Brigitte Cros (LPGP/Orsay) • Progress and plans on warm cavity technology Sergio Calatroni (CERN) • Summary of the workshop on polarized positron source based on Compton back scattering Louis Rinolfi (CERN) • An SC RF Facility at CERN ? Lutz Lilje (DESY) • Achievements and plans for Instrumentation and Beam Dynamics Daniel Shulte (CERN) F. Richard LAL/Orsay

  6. FP7 discussion •   New Inf (10') Francois Richard (LAL) • Infrastructures for R&D on SC available at CERN Sergio Calatroni (CERN) • Possible synergy with R&D for protons Jean-Pierre Delahaye (CERN) • The ELI proposal Victor Malka (LOA) • Questions and issues on an new IS for SCRF Lutz Lilje (DESY) • Proposals for JRA Francois Richard (LAL) F. Richard LAL/Orsay

  7. Participation: 85 F. Richard LAL/Orsay

  8. Preparation of FP7 • First discussion within ESGARD February • From Pasini: no call for I3 before end 2007 and low funding on DS • Important discussions took place at the CCSG in Berlin Zeuthen beginning of May -> ELAN meeting was timely on these issues • What are our goals after CARE+EUROTEV ? • Why do we need a European SC RF facility beyond TTF ? F. Richard LAL/Orsay

  9. European SC RF Facility at CERN • LoI sent to the CERN-Council SG ON March 15 • Participation of ELAN (L. Lilje, F.R.) • Basic idea: TTF facility (SC technology) heavily used for XFEL and should be partially replaced by a new facility dedicated to R&D on SC • CERN, as a center of excellency for SC, could house such a facility • Needs support from the CERN-Council to be inscribed by ESFRI in the roadmap F. Richard LAL/Orsay

  10. Vancouver Evolution on various issues (cost): • Xangles 2+20 mrad -> 14+14 mrad Not final: R&D on magnets (NbSn) strongly encouraged • Generation of e+ : re-consider ‘classical option’ Then Compton for polarized e+ • 1 e+ DR seems feasible • 1 Tunnel option comes back • … F. Richard LAL/Orsay

  11. F. Richard LAL/Orsay

  12. Conclusions • Very active period on electron accelerator R&D • Successful ELAN workshop at Orsay • ELAN is a useful tool in: - Supporting workshops on future linear colliders - Promoting new techniques for acceleration - Preparing for FP7 F. Richard LAL/Orsay

  13. Main Deliverable for 2006 • Data base on diagnostics performance WP4 CCLRC, UMA • Web page connected to GDE • http://www.pp.rhul.ac.uk/~blair/ELAN/INSTR/ELAN_INSTR_home.htm F. Richard LAL/Orsay

  14. F. Richard LAL/Orsay

  15. Subsystems 10.1 Controls Standard Architecture 10.2 Timing system 10.3 Diagnostic Interlock Layer 10.4 Global Accelerator Network 10.5 Machine Protection System 10.6 Low Level RF 10.7 Feedback 10.8 Controls - Instrumentation Integration 10.9 Machine Detector Interface (TBA) 10.10 Beam Position Monitors 10.11 Transverse Profile Monitors 10.12 Longitudinal Diagnostics System.pdf 10.13 Special Systems (TBA) Alternatives Description Supporting Documentation Required R&D F. Richard LAL/Orsay