130 likes | 231 Views
News from ELAN. SC of CARE. News from ILC. At LCWS05 (March at Stanford: 400 participants with MDI+ACCEL) B. Barish has accepted to lead the GDE http://www.fnal.gov/directorate/icfa/ Costing document due end of 2006
E N D
News from ELAN SC of CARE F. Richard CARE/ELAN
News from ILC • At LCWS05 (March at Stanford: 400 participants with MDI+ACCEL) B. Barish has accepted to lead the GDE http://www.fnal.gov/directorate/icfa/ Costing document due end of 2006 3 GDE regional Directors+costing engeneers+30 CORE team (distributed) • Snowmass meeting 2 weeks in August to reach ILC configuration Physics (Aspen), Detector, Accelerator (after KeK) • EUDET: I3 for detector 8.6 M€ • ESFRI priorities for FP7: acknowledges ILC among “Global projects”:http://www.cordis.lu/era/esfri_home.htm - International Large Collider (ILC) - Square Kilometre Array (SKA) – radio telescope – - International Fusion Materials Irradiation Facility (IFMIF) - ITER F. Richard CARE/ELAN
ROADMAP shown at the KeK ILC meeting F. Richard CARE/ELAN
ELAN Meetings in 2005 • Procedure: relevant European WS +acknowledgement of ELAN support (logo) Document(s) ELAN issued • List in http://esgard.lal.in2p3.fr/Project/Activities/Current/Networking/N2/ELAN/Workshops/ • Support for international (ILC) meetings: LCWS05 (MDI, ACCEL)+SNOWMASS F. Richard CARE/ELAN
Workshops Supported by ELAN Avoid duplication with EUROTeV F. Richard CARE/ELAN
Program for a ½ day ELAN program At the London ILC Meeting (June 20-23 2005) Talk on GDE Plans of the GDE X 35+5 Talk on ELAN Future plans of ELAN FR 20+5 Talk on NC CTF, PHIN, Alignt meeting of Annecy GG 35+10 Plans for Snowmass Break 15 minutes Talk on SC TTF,SRF,recent workshops LL 35+10 Plans for Snowmass Talk on ANAD The Paris workshop, future plans BC 35+10 Talk on DR Frascati workshop Maria Enrica Biagini (Frascati) 35+10 Parallel sessions : WP6 only (SC RF) General comments : These talks are meant to be interesting for a general public, giving the general picture but also focusing on some well chosen items which have critical implications F. Richard CARE/ELAN
ILC-BDIR + ELAN +EUROTeVWorkshop F. Richard CARE/ELAN
ELAN Money • Under spent in 2004 mainly DESY INFN CERN 100k/168k • More activity expected in 2005 • 254k requested for 18 months (+15 %) • Concern with CNRS money (Comptable from University not accepted, ‘Clause 23’ allows UMR-Orsay to be considered as a contractor TG) F. Richard CARE/ELAN
ELAN Management • G. Blair has replaced S. Smith Web page for INSTR • Two non UE associates: - US: SLAC (M. Ross) - Israel: Technion (S. Tarem) • Support for students for an ANAD school in Scotland ? • ANAD launching a NEST outline proposal EUROLEAP:European Laser Electron controlled Acceleration in Plasmas to GeV energy range F. Richard CARE/ELAN
Conclusion • After a first year with ‘centralized’ workshops we are moving to a more distributed organization to cope with the ILC and ANAD efforts • There will be an ELAN dedicated meeting in London (BDYN-INSTR WS) and also an other one at the end of the year • Priority to catch up on INSTR • ELAN and EUROTeV complementarities are carefully discussed • Flexibility to cope with the ILC evolving situation F. Richard CARE/ELAN