1 / 11

IEC TC 88 PT 61400-5 IEC 61400-5 Ed.1: Wind Turbines – Part 5: Rotor Blades

IEC TC 88 PT 61400-5 IEC 61400-5 Ed.1: Wind Turbines – Part 5: Rotor Blades. IEC TC 88 Meeting NREL-NWTC 11-12 March, 2010. Presentation Overview. PT 61400-5 history Meetings and participation General timeline Technical scope/ relevance Intended audience Committee issues

cyrus-tyson
Download Presentation

IEC TC 88 PT 61400-5 IEC 61400-5 Ed.1: Wind Turbines – Part 5: Rotor Blades

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEC TC 88PT 61400-5IEC 61400-5 Ed.1: Wind Turbines –Part 5: Rotor Blades • IEC TC 88 Meeting • NREL-NWTC • 11-12 March, 2010

  2. Presentation Overview • PT 61400-5 history • Meetings and participation • General timeline • Technical scope/relevance • Intended audience • Committee issues • TC 88 coordination • Future work

  3. PT 61400-5 History • TC 88 Meeting – October, 2008 • New work item proposal: 88/345/NP • March 6th, 2009 • NC Voting Open • March 6th through June 12th, 2009 • Results of voting circulated: 88/351/RNV • August 28th, 2009 • Work item approved • New project team convened • Team Leader: Mr. Wang Jianping (CN) • Inaugural meeting: October, 2009 – Geneva, Switzerland

  4. PT5 Meetings • Meeting #1: • October 14-15, 2009 • IEC Headquarters • Geneva, Switzerland • Meeting #2: • January 13-15, 2010 • Gloria Plaza Hotel • Beijing, China

  5. PT5 Participation

  6. PT5 Timeline

  7. PT5 Technical Scope • Blade design • Environmental conditions • Aerodynamic design • Design loads • Material requirements • Structural design • Blade manufacturing requirements • Critical processes and quality control • Tooling qualification and maintenance • Manufacturing tolerances • Calibrations • Workshop and storage environment • Final manufacturing inspection • Manufacturing and QA records • Test Methods • Blade Handling • Field Operation and Maintenance

  8. 61400-5 Intended Audience • Blade designers • Turbine designers • Blade manufacturers • Field operators

  9. PT5 Committee Issues • Agreement of scope • Source documents • Manufacturing methods • Style of work

  10. TC 88 Coordination • 61400-1 • Design criteria • 61400-23 • Blade testing • Full scale structural • Material – coupon level • NDT • Weight and balance • Proof testing • 61400-24 • Lightning protection

  11. PT5 Future Work • Continue refining sections • Based upon scope • Develop detailed text for sections • Produce CD • Planned meetings: • May, 2009: Aalborg, Denmark • September, 2009: Hohhot (Huhehot), China

More Related